Ori
gin OR1 Rowing Machine ASSEMBLY INSTRUCTIONS
STEP 1
Clear a 2 Meter by 2.5 Meter working space before
unpacking your Origin OR1 Rowing Machine.
STEP2
Open the carton as shown in the diagram below. NOTE:
To protect the Origin OR1 Rowing Machine
,
while
assembling we suggest that you do not remove the
Protective Packing Material until it is absolutely
necessary.
STEP3
N Place the MAIN FRAME [002] in the Carton Lid as
shown in the diagram below.
B) Remove 4 x BOLT [300] from MAIN FRAME [002]
with the tool provided.
C) Assemble the FRONT STABILIZER [005] with the
same 4 x BOLT [300] and tighten firmly.
STEP4
/lv Remove the ALUMINUM BEAM [001] from the
carton and place it on top of the carton lid as shown in
the diagram below.
B) Remove 4 x BOLT [300] from ALUMINUM BEAM
[001] and 2 x BOLT [367] from REAR STABILIZER
[006] with the tool provided.
C) Assemble REAR STABILIZER [006] with the same 4
x BOLT [300] and tighten firmly.
D) Assemble ALUMINUM BEAM END CAP [116] with 2
x BOLT [367] and tighten firmly.
E) Remove the twist tie and discard.
STEPS
Pv Remove 4 x BOLT [300] from SEAT [119] with the
TOOL provided.
B) Assemble SEAT [119] with the same 4 x BOLT [300]
and tighten firmly.
STEP6
Pv Remove 4 x BOLT [303] from CARRIAGE with the
tool provided.
B) Assemble 2 x SEAT CARRIAGE COVER [117] with
the same 4 x BOLT [303] and tighten firmly.
NOTE: Ensure that the 2 x SEAT CARRIAGE COVER
[117] engage correctly into each other as shown in the
diagram below.
STEP7
N Remove the partly assembled rower from the carton
lid and place it the correct way up as shown in the
diagram below.
B) Remove the SAFETYSTRAP HOLDER and discard.
Place the HANDLE BAR in it_s HOLDER.
C) Remove 2 x BOLT [333] from MAIN FRAME [002]
and 2 x BOL T[369] from ALUMINUM BEAM [001] with
the tool provided.
D) Assemble the ALUMINUM
BEAM [001] with the
same 2 x BOLT [333] and 2 x BOLT [369]. and tighten
firmly into MAIN FRAME [002].
SAFETY STRAP
HOLDER
•