Backing
2 Small
Drawer
left sides
b
a
a
b
a
freedomRail Garage Assembly Instructions
3 Drawer GOBox
Contents of Package
Right Side
Left Side
(1) Large Drawer Back
(2) Small Drawer Backs
(3) Drawer Bottoms
(1) Large
Drawer
Left Side
(1) Large
Drawer
Right Side
(2)
Small
Drawers
Left
Sides
(2)
Small
Drawers
Right
Sides
(2) Small Drawer Fronts
(1) Large Drawer Front
Proper Care for an OBox: Use Goo Gone™ or Simple Green® with a rag or putty knife to remove any excess glue or marring that was caused by shipping or assembly.
Step 1: Attach Hanging Brackets
Assembling the 3 Drawer GOBox
Step 2: Install Connector Bolts
Left Side
Right Side
Back Edge
Back Edge
Top and Bottom
Smaller Holes for
Connector Bolts
Install (4) Connector Bolts into small holes on Top and Bottom Panels.
Step 3: Attach Sides
Cam
Lock
Open
(a) Attach Sides to Bottom. (b) Tighten Cams by turning clockwise until snug.
(a) Attach Top. (b) Tighten Cams by turning clockwise until snug.
Step 4: Attach Top
Attach Hanging Brackets to Sides using Euroscrews.
(If using power drill, set torque to low setting.)
Top
1
Over
Bottom
Top
(6)
(3) Handles
Machine Screws
(For Handles)
(6) Full Extension Drawer Glides
Tools Required
#2 Phillips
Screwdriver
#2 Phillips Driver
(34) Euroscrews
(6) 1 5/8" Wood Screws
(14) Connector Bolts
(16) Backing Nails
Hanging
Brackets
(2)
Hammer
Power Drill
Align Arrow With Hole.