15
(34)
145 mm
442 mm
X
X
X
X
Y
50 mm
1620 mm
145 mm
Pr
e-ins
talla
tion
Mark the finished floor height,
where it is level
(>145 mm)
.
Inclination will be accounted for at
a later stage.
X
X
Finished floor height where it is level.
Finished floor height where it is level.
Finished floor height where
Floor tiles are level with, or
higher than the Frame.
CAUTION.
Crucial that all nogging pieces are in level and
set according to recommended measurements to avoid
misalignment in the shower installation.
Y
Wall thickness after completed installation.
≥
80 mm
145 mm
≥
45 mm
≥
45 mm
2100 mm
85 mm
>85 mm
Summary of Contents for Oas Indo OS8732 Ei2
Page 1: ...Oas Indo Manual Oas Indo EU PRE INSTALLATION 190923 PRE INSTALLATION ...
Page 5: ...6 34 INSTALLATION OVERVIEW ...
Page 10: ...11 34 PRE INSTALLATION watch video https bit ly 2TOBJNA ...
Page 19: ...20 34 Pre installation ...
Page 28: ...29 34 Pre installation ...
Page 31: ...32 34 2 mm 2 mm Pre installation ...
Page 33: ...C E R T I F I E D S PA C E T E C H N O L O G Y ...