Site Planning Checklists
This section provides checklists for site preparation.
Preparation Checklists
Complete the following checklists to ensure that your site meets the physical, electrical, and
environmental requirements of the Oracle Server X8-8 before you receive the server.
■
“Access Route and Data Center Checklist” on page 123
■
“Data Center Environment Checklist” on page 124
■
“Facility Power Checklist” on page 125
■
“Rackmount Checklist” on page 125
■
“Safety Checklist” on page 126
■
“Auto Service Request Checklist” on page 127
■
“Logistics Checklist” on page 127
Access Route and Data Center Checklist
Review the following facility requirements before installing the server.
Data Center Room Considerations
Yes No N/A
Comment
Has the access route been checked for clearances of the packaged equipment?
Do all the doors and entry ways conform to the width and height requirements for transportation,
including the width of the unpacked unit?
Are there any ramps, stairs, or thresholds that are in the moving path for the new hardware?
Have you confirmed that the access route is free of any obstacles that would expose the device to
shock?
Site Planning Checklists
123
Summary of Contents for X8-8
Page 1: ...Oracle Server X8 8 Installation Guide Part No E93400 02 June 2019 ...
Page 2: ......
Page 10: ...10 Oracle Server X8 8 Installation Guide June 2019 ...
Page 24: ...24 Oracle Server X8 8 Installation Guide June 2019 ...
Page 40: ...40 Oracle Server X8 8 Installation Guide June 2019 ...
Page 72: ...72 Oracle Server X8 8 Installation Guide June 2019 ...
Page 112: ...112 Oracle Server X8 8 Installation Guide June 2019 ...
Page 122: ...122 Oracle Server X8 8 Installation Guide June 2019 ...
Page 134: ...134 Oracle Server X8 8 Installation Guide June 2019 ...