
Install the Cable Management Arm (Optional)
the server into the rack until the slide-rail locks (on the front of the mounting
brackets) engage the slide-rail assemblies with an audible click.
Caution -
Before you install the optional cable management arm verify that the server is
securely mounted in the rack and that the slide-rail locks are engaged with the mounting
brackets.
Related Information
■
“Install the Cable Management Arm (Optional)” on page 54
Install the Cable Management Arm (Optional)
Follow this procedure to install the cable management arm (CMA), which you can use to
manage cables connected to the back of the server.
54
Oracle Servers X7-2 and X7-2L Installation Guide • October 2017
Summary of Contents for X7-2
Page 1: ...Oracle Servers X7 2 and X7 2L Installation Guide Part No E72440 03 October 2017 ...
Page 2: ......
Page 10: ...10 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Page 24: ...24 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Page 34: ...34 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Page 38: ...38 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Page 70: ...70 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Page 82: ...82 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Page 118: ...118 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Page 124: ...124 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Page 144: ...144 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...