Reinstall the Server Chassis in the Rack
Related Information
■
“Take Antistatic Measures” on page 81
■
“Install the Top Cover” on page 211
■
“Reinstall the Server Chassis in the Rack” on page 213
Reinstall the Server Chassis in the Rack
After servicing the system, reinstall it back into the rack.
Caution -
The server weighs approximately 41 lbs (18.6 kg). Two people are required to carry
the chassis and install it in the rack.
Lift the server from the antistatic mat and reinstall the server into the rack.
Refer to the
Sun Netra X4270 Server Installation Guide
for the installation instructions specific
to your rackmount kit.
Related Information
■
“Remove the Server From the Rack” on page 80
■
“Remove Antistatic Measures” on page 212
■
“Reconnect Power and Data Cables” on page 213
Reconnect Power and Data Cables
1.
Reconnect the data cables to the rear of the server, as appropriate.
2.
Reconnect the power cables to the power supplies.
3.
If necessary, reinstall the appropriate cables in to a cable management device.
4.
Power on the server.
“Power On the Server” on page 214
.
Related Information
■
“Disconnect Cables From the Server” on page 80
■
“Reinstall the Server Chassis in the Rack” on page 213
■
“Power On the Server” on page 214
Returning Server to Operation
213
Summary of Contents for Sun Netra X4270
Page 1: ...Sun Netra X4270 Server Service Manual Part No E23171 03 September 2015 ...
Page 2: ......
Page 10: ...10 Sun Netra X4270 Server September 2015 ...
Page 12: ...12 Sun Netra X4270 Server September 2015 ...
Page 36: ...36 Sun Netra X4270 Server September 2015 ...
Page 72: ...72 Sun Netra X4270 Server September 2015 ...
Page 100: ...100 Sun Netra X4270 Server September 2015 ...
Page 224: ...224 Sun Netra X4270 Server September 2015 ...
Page 230: ...WDT W WDT watchdog timers 230 Sun Netra X4270 Server September 2015 ...