Return the Server to the Normal Operating Position
Return the Server to the Normal Operating Position
Caution -
The chassis is heavy. To avoid personal injury, use two people to lift the server and
set it in the rack.
1.
Release the slide rails from the fully extended position by pushing the release
tabs on the side of each rail.
2.
While pushing on the release tabs, slowly push the server into the rack.
Ensure that the cables do not get in the way.
3.
Reconnect the cables to the rear of the server.
If the CMA is in the way, disconnect the left CMA release and swing the CMA open. See
.
4.
Reconnect the CMA.
Swing the CMA closed and latch it to the left rack rail. See
Server Installation
for more detail
about attaching the CMA.
Returning the Server to Operation
173
Summary of Contents for SPARC T7-2
Page 1: ...SPARC T7 2 Server Service Manual Part No E54987 10 July 2019 ...
Page 2: ......
Page 10: ...10 SPARC T7 2 Server Service Manual July 2019 ...
Page 12: ...12 SPARC T7 2 Server Service Manual July 2019 ...
Page 28: ...28 SPARC T7 2 Server Service Manual July 2019 ...
Page 64: ...64 SPARC T7 2 Server Service Manual July 2019 ...
Page 84: ...84 SPARC T7 2 Server Service Manual July 2019 ...
Page 112: ...112 SPARC T7 2 Server Service Manual July 2019 ...
Page 116: ...116 SPARC T7 2 Server Service Manual July 2019 ...
Page 120: ...120 SPARC T7 2 Server Service Manual July 2019 ...
Page 134: ...134 SPARC T7 2 Server Service Manual July 2019 ...
Page 146: ...146 SPARC T7 2 Server Service Manual July 2019 ...
Page 164: ...164 SPARC T7 2 Server Service Manual July 2019 ...
Page 170: ...170 SPARC T7 2 Server Service Manual July 2019 ...
Page 176: ...176 SPARC T7 2 Server Service Manual July 2019 ...
Page 182: ...182 SPARC T7 2 Server Service Manual July 2019 ...
Page 188: ...188 SPARC T7 2 Server Service Manual July 2019 ...