Returning the Server to Operation
191
Returning the Server to Operation
These topics explain how to return the server from Oracle to operation after you have
performed service procedures.
Steps
Description
Links
1.
Apply power to the server.
“Connect the Power Cords” on page 191
2.
Start the system.
■
■
3.
Either return to the service operation that you were
performing, if applicable, or return to the upgrade
process.
“Component Service Categories” on page 52
“Server Upgrade Process” on page 59
Related Information
■
■
“Detecting and Managing Faults”
■
■
“Component Service Task Reference” on page 23
Connect the Power Cords
1.
Connect a terminal device, if necessary.
2.
Find the AC connectors on the rear of the server.
“Rear Panel Components (Service)” on page 15
3.
Connect the power cords.
Note -
As soon as power is applied, standby power is applied, and the SP boots. Depending on
Oracle ILOM policy settings, the host might also boot in parallel.
Summary of Contents for SPARC T5-8
Page 1: ...Part No E35082 14 November 2015 SPARC T5 8 Server Service Manual ...
Page 2: ......
Page 10: ...10 SPARC T5 8 Server Service Manual November 2015 ...
Page 12: ...12 SPARC T5 8 Server Service Manual November 2015 ...
Page 48: ...48 SPARC T5 8 Server Service Manual November 2015 ...
Page 58: ...58 SPARC T5 8 Server Service Manual November 2015 ...
Page 108: ...108 SPARC T5 8 Server Service Manual November 2015 ...
Page 122: ...122 SPARC T5 8 Server Service Manual November 2015 ...
Page 140: ...140 SPARC T5 8 Server Service Manual November 2015 ...
Page 148: ...148 SPARC T5 8 Server Service Manual November 2015 ...
Page 180: ...180 SPARC T5 8 Server Service Manual November 2015 ...
Page 190: ...190 SPARC T5 8 Server Service Manual November 2015 ...
Page 194: ...194 SPARC T5 8 Server Service Manual November 2015 ...
Page 200: ...200 SPARC T5 8 Server Service Manual November 2015 ...
Page 206: ...206 SPARC T5 8 Server Service Manual November 2015 ...