
Connecting Data and Management Cables
Connecting the Server Cables
61
Note -
The cable length used to connect between the monitor and the VGA port should not be
over 6 meters.
Pin
Signal Description
Pin
Signal Description
1
Red Video
9
[KEY]
2
Green Video
10
Sync Ground
3
Blue Video
11
Monitor ID - Bit 1
4
Monitor ID - Bit 2
12
VGA 12C Serial Data
5
Ground
13
Horizontal Sync
6
Red Ground
14
Vertical Sync
7
Green Ground
15
VGA 12C Serial Clock
8
Blue Ground
Related Information
■
“Rear Panel Components” on page 14
■
“Cabling Requirements” on page 55
■
“Connecting the Server Cables”
Connecting Data and Management Cables
After you have connected these cables, see
“Powering On the Server for the First Time”
connecting the AC power cords.
Caution -
Use only the power cords provided with the server.
■
Summary of Contents for SPARC T5-4
Page 1: ...Part No E29662 10 July 2015 SPARC T5 4 Server Installation Guide ...
Page 2: ......
Page 8: ...8 SPARC T5 4 Server Installation Guide July 2015 ...
Page 10: ...10 SPARC T5 4 Server Installation Guide July 2015 ...
Page 16: ...16 SPARC T5 4 Server Installation Guide July 2015 ...
Page 22: ...22 SPARC T5 4 Server Installation Guide July 2015 ...
Page 66: ...66 SPARC T5 4 Server Installation Guide July 2015 ...
Page 88: ...88 SPARC T5 4 Server Installation Guide July 2015 ...
Page 92: ...92 SPARC T5 4 Server Installation Guide July 2015 ...