74
SPARC M5-32 and SPARC M6-32 Servers Installation Guide • December 2014
2. Note problems or peculiarities at the site that require special equipment.
For example, ensure that the doors are tall enough and wide enough for the
server.
See
“Shipping Container Dimensions” on page 54
and
for more information.
3. Install all necessary electrical equipment, and ensure that sufficient power is
provided for the server.
See
“Facility Power Requirements” on page 37
4. If you will be routing power cords or data cables down through the floor,
prepare a floor cutout for these cables.
See
“Mounting Holes and Cable Routing Floor Cutout Specifications” on page 28
for the floor cutout dimensions.
5. Ensure that the installation site provides adequate air conditioning.
See
“Heat Dissipation and Airflow Requirements” on page 47
for more
information.
6. Prepare the entire route from the loading dock to the installation site.
See
“Access Route Guidelines” on page 55
7. Prepare a 3/16-inch (4.8-mm) thick A36 metal plate with beveled edges that is
large enough to support the server when it rolls over gaps or holes in the floor.
See
“Use a Metal Plate to Cross Gaps in the Floor” on page 82
for more
information.
8. If necessary, prepare a metal ramp to go up or down minor elevation changes.
See
“Move Server Up or Down a Ramp” on page 84
for more information.
9. Operate the air conditioning system for 48 hours to bring the room temperature
to the appropriate level.
10. Clean and vacuum the area thoroughly in preparation for installation.
Related Information
■
“Preparing the Site” on page 19
■
Summary of Contents for sparc M5-32
Page 1: ...SPARC M5 32 and SPARC M6 32 Servers Installation Guide Part No E41215 05 December 2014 ...
Page 8: ...viii SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Page 16: ...6 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Front Components ...
Page 18: ...8 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Rear Components ...
Page 21: ...Understanding the Server 11 FIGURE DCU Locations Rear of Server ...
Page 51: ...Preparing the Site 41 ...
Page 82: ...72 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Page 106: ...96 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Page 182: ...172 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...