3-16
External I/O Expansion Unit for SPARC Enterprise M
x
000 Servers Installation and Service Manual • April 2011
FIGURE 3-18
PCI Card and Carrier
15. Use the carrier locking screw located on the top of the handle to lock the carrier
handle in place.
16. Add the PCI card to an Oracle Solaris domain.
For details, refer to the service manual for your host server.
3.3
Installing Cables for PCI Cards
1. Use an antistatic strap for this procedure.
2. Route the cables across the top of the cable management unit as shown in
or
a. Route the cables in the rack:
■
For the type A cable plate, route the cables along the both sides of the rack.
■
For the type B cable plate, route the cables along the right side of the rack.
b. Place the ends of the cables on the top of the cable plate, then curve the
cables down to the corresponding PCI cards.
c. Use cable ties to hold the cables in place on the top of the cable management
unit.
Figure Legend
1
Carrier handle (in closed position)
2
Carrier locking screw
Summary of Contents for SPARC Enterprise M4000
Page 4: ......