Connect AC Power Cords
Connect AC Power Cords
1.
Reconnect the power cords to the power supplies.
Note -
As soon as the power cords are connected, standby power is applied. Depending on how
the firmware is configured, the system might boot at this time.
2.
Power on the server.
See one of these topics:
■
“Power On the Server (Oracle ILOM)” on page 249
■
“Power On the Server (Power Button)” on page 250
Related Information
■
“Install the Top Cover” on page 246
■
“Disconnect Power Cords and Data Cables” on page 52
■
“Power On the Server (Oracle ILOM)” on page 249
■
“Power On the Server (Power Button)” on page 250
Power On the Server (Oracle ILOM)
1.
Access Oracle ILOM.
Returning a Server to Operation
249
Summary of Contents for Netra SPARC S7-2
Page 1: ...Netra SPARC S7 2 Server Service Manual Part No E73207 03 February 2017 ...
Page 2: ......
Page 12: ...12 Netra SPARC S7 2 Server Service Manual February 2017 ...
Page 24: ...24 Netra SPARC S7 2 Server Service Manual February 2017 ...
Page 42: ...Server Fault Remind Button Operation 42 Netra SPARC S7 2 Server Service Manual February 2017 ...
Page 84: ...84 Netra SPARC S7 2 Server Service Manual February 2017 ...
Page 108: ...108 Netra SPARC S7 2 Server Service Manual February 2017 ...
Page 140: ...140 Netra SPARC S7 2 Server Service Manual February 2017 ...
Page 150: ...150 Netra SPARC S7 2 Server Service Manual February 2017 ...
Page 158: ...158 Netra SPARC S7 2 Server Service Manual February 2017 ...
Page 192: ...192 Netra SPARC S7 2 Server Service Manual February 2017 ...
Page 216: ...216 Netra SPARC S7 2 Server Service Manual February 2017 ...
Page 258: ...258 Netra SPARC S7 2 Server Service Manual February 2017 ...