Returning MiniCluster to Operation
This chapter describes how to return MiniCluster to operation after you have performed service
procedures. It includes:
■
“Returning Compute Nodes to Operation” on page 35
■
“Powering On MiniCluster” on page 35
Returning Compute Nodes to Operation
This section describes returning compute nodes to operation after servicing.
Note -
The links in the following list take you to instructions
outside
of the MiniCluster library
to the SPARC S7-2 documentation library. Use your browser's Back button to return to the
MiniCluster library.
■
SPARC S7-2 Server Service Manual
■
“Return the Server to the Normal Operating Position” in
■
“Reconnect Data Cables and Power Cords” in
SPARC S7-2 Server Service Manual
■
SPARC S7-2 Server Service Manual
Powering On MiniCluster
This section describes how to restore power after servicing MiniCluster.
Before you begin, return the compute nodes to operational status. Go to
Nodes to Operation” on page 35
When powering on the system, each compute node is powered on separately.
Returning MiniCluster to Operation
35
Summary of Contents for MiniCluster S7-2
Page 1: ...Oracle MiniCluster S7 2 Service Manual Part No E76798 02 March 2017 ...
Page 2: ......
Page 8: ...8 Oracle MiniCluster S7 2 Service Manual March 2017 ...
Page 16: ...16 Oracle MiniCluster S7 2 Service Manual March 2017 ...
Page 30: ...30 Oracle MiniCluster S7 2 Service Manual March 2017 ...
Page 32: ...32 Oracle MiniCluster S7 2 Service Manual March 2017 ...
Page 34: ...34 Oracle MiniCluster S7 2 Service Manual March 2017 ...
Page 38: ...38 Oracle MiniCluster S7 2 Service Manual March 2017 ...