
Connect the RJ-45 Ethernet Cables
■
“I/O Module Cable Requirements” on page 52
■
“Standard MT and PrizmMT Cables” on page 53
■
“Standard MT and PrizmMT Cable Precautions” on page 55
■
“General Cable Precautions” on page 56
■
“(Optional) Assemble the QSFP Cables” on page 58
■
“(Optional) Assemble the SFP+ Cables” on page 60
■
“Connect the RJ-45 Ethernet Cables” on page 63
■
“Connect the PrizmMT Cables” on page 66
■
“Connect the QSFP Cables” on page 69
■
“Secure Cables to the Cable Management Comb” on page 73
Connect the RJ-45 Ethernet Cables
Use this procedure to connect RJ-45 cables to an Oracle F2 Quad Port 10GBASE-T I/O module
as well as to the switch chassis.
1.
Identify the prerequisite and subsequent installation tasks that you must
perform in conjunction with this task.
“Installation Task Overview” on page 11
.
2.
Orient the RJ-45 connector to where it will connect to the switch.
Connecting Cables
63
Summary of Contents for Fabric Interconnect F2-12
Page 1: ...Oracle Fabric Interconnect F2 12 Installation Guide Part No E74400 01 November 2016...
Page 2: ......
Page 8: ...8 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...
Page 10: ...10 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...
Page 22: ...22 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...
Page 88: ...88 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...
Page 118: ...118 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...