background image

 

6.

Carefully slide the disk shelf into the cabinet. Ensure that it is fully seated within
the rails. If removing the disk shelf to reseat it, support it at all times.

7.

Secure the front of the disk shelf using the two captive screws, [1] and [2].

 

 

8.

If shipping the racked disk shelf, install screw [1] and [2] into each rear chassis ear
[A].

 

 

Installing an Oracle Storage Drive Enclosure DE3-24C Disk
Shelf

Oracle Storage Drive Enclosure DE3-24C requires four rack units (RUs), or twelve
rack holes, of vertical space in the cabinet.

Chapter 3

Installing an Oracle Storage Drive Enclosure DE3-24C Disk Shelf

3-4

Summary of Contents for DE2-24C

Page 1: ...Oracle ZFS Storage Appliance Installation Guide Release OS8 8 x F13767 09 August 2022...

Page 2: ...computer documentation and or iii other Oracle data is subject to the rights and limitations specified in the license contained in the applicable contract The terms governing the U S Government s use...

Page 3: ...torage Drive Enclosure DE3 24P Disk Shelf 2 16 Oracle Storage Drive Enclosure DE3 24C Disk Shelf 2 17 Oracle Storage Drive Enclosure DE2 24 2 20 Oracle Storage Drive Enclosure DE2 24P Disk Shelf 2 20...

Page 4: ...le ZFS Storage ZS5 2 Front Panel Components 2 38 Oracle ZFS Storage ZS5 2 Rear Panel Components 2 38 Cable Management Arm 2 39 Overview of the Oracle ZFS Storage ZS4 4 Controller 2 40 Oracle ZFS Stora...

Page 5: ...acle ZFS Storage ZS9 2 Controller Installing the Slide Rails onto an Oracle ZFS Storage ZS9 2 Controller 4 1 Installing the Slide Rails into the Rack for an Oracle ZFS Storage ZS9 2 Controller 4 2 Ins...

Page 6: ...ZS4 4 or Oracle ZFS Storage ZS3 4 Controller onto the Rack Slide Rails 8 3 Installing an Oracle ZFS Storage ZS4 4 or Oracle ZFS Storage ZS3 4 Cable Management Arm 8 5 9 Installing an Oracle ZFS Storag...

Page 7: ...an Oracle Storage Drive Enclosure DE3 24 or DE2 24 Disk Shelf 12 1 Powering On a Sun Disk Shelf 12 2 Powering On a Controller 12 3 Powering Off a Controller 12 3 Powering Off a Disk Shelf 12 4 13 Conf...

Page 8: ...ling an Oracle ZFS Storage ZS9 2 Controller Installing an Oracle ZFS Storage ZS7 2 Controller Installing an Oracle ZFS Storage ZS5 4 Controller Installing an Oracle ZFS Storage ZS5 2 Controller Instal...

Page 9: ...the Oracle ZFS Storage ZS4 4 Controller Overview of the Oracle ZFS Storage ZS3 4 Controller Overview of the Oracle ZFS Storage ZS3 2 Controller Overview of the Sun ZFS Storage 7420 Controller Overview...

Page 10: ...s specified temperature range Always use the width spacer alignment tool when installing rails into racks that use cage nuts and mounting screws Failure to use the spacer can cause the glides and slid...

Page 11: ...t Oracle Storage Drive Enclosure DE2 24P A mechanical lift is highly recommended because the chassis can be too heavy to lift otherwise At least three people are required two to install the shelf and...

Page 12: ...ains guidelines for properly placing and connecting the disk shelves Cabinet Configuration For safety reasons mount the heaviest equipment typically disk shelves at the bottom of the cabinet Refer to...

Page 13: ...urther than two adjacent cabinets is 20 meters Oracle Storage Drive Enclosure DE2 24 disk shelves with specific drive types see Cabling Mixed Oracle Storage Drive Enclosure DE3 24 and DE2 24 Disk Shel...

Page 14: ...4 port HBA SAS 2 2x4 port HBA for only Sun ZFS Storage 7120 The following table describes which disk shelf models can be used together for which controller configurations starting with software releas...

Page 15: ...FS Storage ZS5 2 with SAS 3 4x4 port HBAs Yes Yes Yes Yes No Oracle ZFS Storage ZS5 2 with SAS 2 4x4 port HBAs No Yes Yes Yes No Oracle ZFS Storage ZS4 4 with SAS 3 4x4 port HBAs Yes Yes Yes Yes No Or...

Page 16: ...to a specific number of total disk shelves The following table details the number of supported disk shelf chains per HBA type Table 2 3 Supported Disk Shelf Chains per HBA HBA Type Number of Disk Shel...

Page 17: ...s SSDs Total number of chains is eight Any combination of disk only and write or read optimized shelves may be combined within the chain in any order Oracle ZFS Storage ZS9 2 mid range model 24 NA NA...

Page 18: ...ors SSDs Total number of chains is eight Any combination of disk only and write or read optimized shelves may be combined within the chain in any order Oracle ZFS Storage ZS7 2 mid range model 24 NA N...

Page 19: ...ors SSDs Total number of chains is eight Any combination of disk only and write or read optimized shelves may be combined within the chain in any order Oracle ZFS Storage ZS5 2 16 NA 2 2 Disk shelves...

Page 20: ...combined within the chain in any order Oracle ZFS Storage ZS3 4 36 NA 4 NA Disk shelves can include 24x HDD or combine 20x HDD plus 4x write optimized flash accelerators SSDs Total number of chains i...

Page 21: ...d flash accelerators SSDs Total number of chains is four Any combination of disk only and write optimized shelves can be combined within the chain in any order You can also connect mixed disk shelf ty...

Page 22: ...l number of chains is six with 2X4 port SAS 2 HBAs and 12 with 4X4 port SAS 2 HBAs Any combination of disk only and write optimized shelves can be combined within the chain in any order You can also c...

Page 23: ...isk shelf type Directly connecting different disk shelf types is not supported Sun ZFS Storage 7120 2 1 NA NA Write optimized SSDs are not supported in the expansion storage for the 7120 The disk shel...

Page 24: ...osure DE3 24P and DE3 24C disk shelves Oracle Storage Drive Enclosure DE3 24P Disk Shelf Oracle Storage Drive Enclosure DE3 24P is a 2U chassis that supports 24 2 5 SAS 3 drives The high performance H...

Page 25: ...e 0 2 I O Module 1 3 I O Module 0 4 Power supply with fan module 1 Oracle Storage Drive Enclosure DE3 24C Disk Shelf Oracle Storage Drive Enclosure DE3 24C is a 4U chassis that supports 24 3 5 SAS 3 d...

Page 26: ...ad optimized cache SSDs can also be installed in the Oracle Storage Drive Enclosure DE3 24C disk shelf for some controllers For slot configuration details and minimum software requirements see Disk Sh...

Page 27: ...losure DE3 24C Rear Panel 1 Power supply filler panel slot 4 2 I O Module 1 3 I O Module filler panel 4 Power supply with fan module 2 5 Power supply filler panel slot 2 6 I O Module filler panel 7 I...

Page 28: ...versal power input connector 6 Power on off switch The Oracle Storage Drive Enclosure DE3 24C and DE3 24P disk shelves use the same power supply Oracle Storage Drive Enclosure DE2 24 This section intr...

Page 29: ...rements see Disk Shelf Configurations in Oracle ZFS Storage Appliance Customer Service Manual Release OS8 8 x Oracle Storage Drive Enclosure DE2 24P Status Indicators Front View 1 System power indicat...

Page 30: ...ions Front View Up to four write optimized log SSDs are supported per disk shelf Log devices should be populated in order of slots 20 21 22 and 23 Read optimized cache SSDs can also be installed in th...

Page 31: ...1 Note It is especially important that power supplies and their filler panels are in the correct slots Oracle Storage Drive Enclosure DE2 I O Module Indicators 1 Fault Locate indicator 2 Power OK indi...

Page 32: ...s use the same power supply Sun Disk Shelf The Sun Disk Shelf is a 4U chassis that supports 24 3 5 SAS 2 drives The SSDs provide accelerated write operations and the high capacity HDDs provide reliabl...

Page 33: ...ure warning indicator 8 SIM board fault indicator 9 Power supply fault indicator Sun Disk Shelf Rear Panel 1 Power supply modules with built in fans Power supply 0 is on the left and power supply 1 is...

Page 34: ...Port OK indicator 9 SIM board OK indicator green SIM board fault indicator amber 10 SIM locator indicator Sun Disk Shelf Power Supply and Fan Module Indicators 1 Cooling fan status indicator 2 AC powe...

Page 35: ...nclosure DE2 24C Components Oracle Storage Drive Enclosure DE2 24C Base Chassis Filler Panel Oracle Storage Drive Enclosure DE2 24C Up to 24 3 5 SAS 2 or SAS 3 HDDs SSDs Sun Disk Shelf DS2 Components...

Page 36: ...ZS9 2 Acoustic Noise Emissions The workplace dependent noise level of this product is 9 5 Bels A weighted Operating and 8 0 Bels A weighted Idling measured Sound Power Oracle ZFS Storage ZS9 2 Configu...

Page 37: ...re shown in the following figure 1 RFID tag 2 System status LED Locator white 3 System status LED Service Action Required amber 4 System status LED Power OK green 5 Power button 6 Fan service action r...

Page 38: ...ange model Filler panel slot not available 10 Not available 11 Serial management SER MGT RJ 45 serial port 12 Service Processor SP NET MGT port 13 Network NET 100 1000BASE T RJ 45 Gigabit Ethernet GbE...

Page 39: ...Power Supplies Nominal input frequencies 50 60 Hz Operating input voltage range 100 240 VAC Rated input current 10 A 100 to 127 VAC and 7 A 200 to 240 VAC Maximum power consumption of controller Refe...

Page 40: ...the remaining ten front disk slots have permanent filler panels The following table describes the configuration options CPU Memory System Disks PCIe Slots HBA 2x18 core 2 3 GHz 512 GB or 1024 GB 2x3...

Page 41: ...racle ZFS Storage ZS7 2 Rear Panel Components The Oracle ZFS Storage ZS7 2 controller PCIe slots and rear panel components are shown in the following figure 1 Power Supply Unit PSU 1 2 PSU 1 status in...

Page 42: ...ZFS Storage Appliance Customer Service Manual Release OS8 8 x Refer to https oracle com zfsstorage for the most recent component specification Oracle ZFS Storage ZS5 4 Physical Specifications The Ora...

Page 43: ...following table describes the configuration options CPU Memory System Disks PCIe Slots HBA 4x18 core 2 6 GHz 1536 GB 2x2 5 SAS 3 Four dedicated seven available 4 port 4x4 SAS 3 12 Gb s external 4 port...

Page 44: ...10 4X4 SAS HBA slot 7 11 Two USB 2 0 ports 12 Network NET 10 Gb Ethernet ports NET 0 NET 3 13 4X4 SAS HBA slot 6 14 Third PCIe slot 5 15 Cluster interface card slot 4 16 Fourth 4X4 SAS HBA or sixth P...

Page 45: ...91 efficiency To understand the overall power consumption see Oracle s online power calculator at http www oracle com goto powercalculators Parameter AC Power Supplies Nominal input frequencies 50 60...

Page 46: ...omponents The Oracle ZFS Storage ZS5 2 controller drive slots and front panel components are shown in the following figure 1 LEDs Locator Service Power 2 System disk 1 3 Permanent HDD filler panels 4...

Page 47: ...mpatibility The Oracle ZFS Storage ZS5 2 controller contains a Version 3 cluster interface card which is incompatible with Version 2 For information about how to connect cables to form a cluster see C...

Page 48: ...LED button white 2 Service action required LED amber 3 Power OK LED green 4 Power button 5 Service Processor SP OK green Fault amber LED 6 Fan CPU Memory Service action required LED amber 7 Power Supp...

Page 49: ...twork NET 10 GbE ports NET 0 NET 1 NET 2 NET 3 8 USB 2 0 connectors 2 9 PCIe card slots 7 11 10 Network management NET MGT 10 100 1000 BASE T Ethernet port 11 Serial management SER MGT RJ 45 port 12 D...

Page 50: ...rt The network management connector NET MGT is an RJ 45 10 100 1000 BASE T Ethernet port and provides an alternate terminal interface to the service processor SP console Serial Management Port The ser...

Page 51: ...numbers are not a rating of the actual power consumption of the appliance Input Nominal frequencies 50 60Hz AC operating range 200 240 VAC Maximum current AC RMS 12A 200 VAC Power Dissipation Max pow...

Page 52: ...Solid state drive 3 optional 15 Solid state drive 4 optional 16 Solid state drive 5 optional The Oracle ZFS Storage ZS3 4 controller has two SAS 2 system boot drives in slots 0 and 1 configured as a m...

Page 53: ...CIe slots 5 9 11 Network management NET MGT 10 100 BASE T Ethernet port 12 Serial management SER MGT port 13 DB 15 video connector Ethernet Ports Oracle ZFS Storage ZS3 4 has four RJ 45 Gigabit Ethern...

Page 54: ...controller 2U chassis dimensions are as follows Dimension Measurement Dimension Measurement Height 3 44 in 87 4 mm Depth 20 25 in 514 mm Width 17 52 in 445 mm Weight 41 23 lb 18 70 kg Oracle ZFS Stor...

Page 55: ...rformance and room for growth with expandable PCIe slots and 16 DIMM slots in a compact 2U footprint The following table describes the configuration options CPU Memory Readzilla Boot Drive PCIe Slots...

Page 56: ...torage ZS3 2 controller PCIe slots and rear panel components are shown in the following figure For more information about PCIe cards see ZS3 2 PCIe I O Cards in Oracle ZFS Storage Appliance Customer S...

Page 57: ...1000 Mbits sec 10 Gigabit Ethernet 10GBASE T Green 10000 Mbits sec Cluster I O Ports Two cluster serial ports 0 and 1 and one Ethernet port provide communication between two controllers to form a clu...

Page 58: ...nector A 2 Front slide bar 3 Velcro straps 6 4 Connector B 5 Connector C 6 Connector D 7 Slide rail latching bracket used with connector D 8 Rear slide bar 9 Cable covers Overview of the Sun ZFS Stora...

Page 59: ...d 200 240 VAC for 2 or 4 CPUs Maximum current AC RMS 12A 100 VAC 12A 200 VAC Power Dissipation Max power consumption 1800 W Max heat output 6143 BTU hr Volt Ampere rating 1837 VA 240 VAC 0 98 P F Sun...

Page 60: ...vice Processor SP OK LED green 6 Fan CPU Memory Service Required LED 7 Power Supply PS Service Required LED 8 Over Temperature Warning LED 9 USB 2 0 Connectors 10 DB 15 video connector 11 Boot drive 0...

Page 61: ...action required amber 3 OK Activity green Sun ZFS Storage 7420 Rear Panel Components The following graphic shows the rear panel of the controller Base configuration HBAs are not depicted in this illu...

Page 62: ...ion instructions refer to Installing a Sun ZFS Storage 7x20 Controller For service instructions refer to Servicing the 7x20 Controller in Oracle ZFS Storage Appliance Customer Service Manual Release O...

Page 63: ...e Sun ZFS Storage 7320 front panel LEDs 1 Locate Button LED 2 Service Required LED amber 3 Power OK LED green 4 Power Button 5 Rear Power Supply 6 System Overtemperature LED 7 Top Fan The following fi...

Page 64: ...re four RJ 45 Gigabit Ethernet ports NET 0 NET 1 NET 2 NET 3 located on the motherboard that operate at 10 100 1000 Mbit sec These network interfaces must be configured before use Network Management P...

Page 65: ...ly The numbers are not a rating of the actual power consumption of the appliance Connectors Two C13 connectors which work on 110 220v outlets Input Nominal frequencies 50 60Hz Nominal voltage range 10...

Page 66: ...iniband QDR HCAdapter PCIe cards 375 3606 01 may be located in slots 1 2 or 3 375 3606 01 HCA expansion cards are not supported in the 10Gb network configurations For more information about PCIe cards...

Page 67: ...e at 10 100 1000 Mbit sec These network interfaces must be configured before use Network Management Port The network management connector NET MGT is an RJ 45 port and provides an alternate terminal in...

Page 68: ...acle Storage Drive Enclosure DE3 24P requires two rack units RUs or six rack holes of vertical space in the cabinet Before You Begin Review Prerequisites for Installation and Overview of Disk Shelves...

Page 69: ...f rails 3 Two packets of four 10 32 cage nuts only one set is required Four 9 5 mm square cage nuts two spares Four 7 mm round cage nuts two spares 3 Attach the disk shelf rails to the rack as follows...

Page 70: ...gh d for the second rail 4 Install one screw through the rack and into the rear of each rail 5 Using a mechanical lift or two people one at each side of the disk shelf carefully lift and rest the shel...

Page 71: ...shelf using the two captive screws 1 and 2 8 If shipping the racked disk shelf install screw 1 and 2 into each rear chassis ear A Installing an Oracle Storage Drive Enclosure DE3 24C Disk Shelf Oracle...

Page 72: ...dles 1 Starting at the bottom of the cabinet locate the appropriate rack unit RU height 2 Unpack the contents of the disk shelf rail kit box and identify the correct cage nuts for your rack type There...

Page 73: ...d open the clamp lever on each rail end 1 and insert both rail ends into the appropriate rack holes 2 d Close the rail clamps over the rails by releasing the clamp lever 3 You will hear an audible cli...

Page 74: ...placement 1 b Insert one cage nut into the appropriate hole in each rack rail 2 6 Using a mechanical lift or three people one at each side of the disk shelf and one in front carefully lift and rest t...

Page 75: ...f removing the disk shelf to reseat it support it at all times 8 Secure the front of the disk shelf using the four captive screws 1 4 9 If shipping the racked disk shelf install screw 1 and 2 into eac...

Page 76: ...Attempting this procedure alone could result in equipment damage or personal injury Do not lift the chassis using the power supply handles 1 Extend all anti tilt and stabilization devices from the bot...

Page 77: ...binet with the rail flange inside of the cabinet flange and the rail label facing the inside of the cabinet The pins should be fully located within the rack holes d Insert and tighten one screw throug...

Page 78: ...until it is fully seated within the cabinet The spotter using a flashlight should ensure that the shelf is fully seated within the rails If removing the shelf to reseat it support it at all times 6 In...

Page 79: ...l space in the cabinet Before You Begin Review Prerequisites for Installation and Overview of Disk Shelves To prevent the cabinet from tipping always load the heaviest equipment which are disk shelves...

Page 80: ...readed cabinet Remove the screws from each rail end and discard Locate the screws for round hole cabinets and place aside Threaded cabinet Remove screws and replace them in the opposite direction from...

Page 81: ...6 Install one screw through the rack and into the rear of each rail 7 Tighten the two locking screws in the rails Chapter 3 Installing an Oracle Storage Drive Enclosure DE2 24C Disk Shelf 3 14...

Page 82: ...de the shelf into the cabinet Ensure that the shelf is fully seated within the rails If removing the shelf to reseat it support it at all times 10 Remove the front side caps install two screws into ea...

Page 83: ...es a minimum of two people or a mechanical lift because of the weight of the chassis Attempting this procedure alone could result in equipment damage or personal injury Always load the heaviest equipm...

Page 84: ...ions on the rack 2 front and 2 back by aligning the two pins on the rail plate with holes on the cabinet rails 3 Insert M6 screws in the top and bottom holes of each rail plate and tighten 8 total pla...

Page 85: ...plates into the corresponding holes of the rail 5 Install four 8 32 screws into the four remaining front and rear holes of each rack rail 16 total 6 Using a mechanical lift or two people one at each...

Page 86: ...lf touch the vertical face of the rack 8 Tighten the captive screws on each side of the front of the shelf to secure the shelf to the rack 9 At the back of the disk shelf slide a system locking clip o...

Page 87: ...ide Rails Installing an Oracle ZFS Storage ZS9 2 Cable Management Arm Verifying Operation of Oracle ZFS Storage ZS9 2 Slide Rails and CMA Installing the Slide Rails onto an Oracle ZFS Storage ZS9 2 Co...

Page 88: ...plan to move the rack after the controller is installed use mounting screws and cage nuts to secure the slide rail assembly Refer to Rail Rackmount Kit Overview and Information card for instructions...

Page 89: ...racle ZFS Storage ZS9 2 Controller onto the Rack Slide Rails Use the following procedure to install an Oracle ZFS Storage ZS9 2 controller onto the rack slide rails Caution This procedure requires a m...

Page 90: ...ensure that both the top and bottom mounting lips of the mounting brackets are inserted into the slide rail The controller should slide forward and backward easily if correctly installed If the unit...

Page 91: ...e to install the cable management arm CMA for an Oracle ZFS Storage ZS9 2 controller The CMA is an assembly that you can use to route the controller cables in the rack This procedure is completed from...

Page 92: ...excess of cables such that the CMA clamps bow or appear structurally unfit to support the weight If using two clustered controllers mounted in the middle of the rack with disk shelves located above an...

Page 93: ...To make it easier to install the CMA extend the controller approximately 13 cm 5 inches out of the front of the rack 5 Take the CMA to the back of the equipment rack and ensure that you have adequate...

Page 94: ...es into the slide rail front slot callout 2 b Gently tug on the right side of the front slide bar to verify that connector B is properly seated Callout Description 1 Connector B tab 2 Right slide rail...

Page 95: ...s properly seated 9 To prepare CMA connector D for installation remove the tape that secures the slide rail latching bracket to connector D and ensure that the latching bracket is properly aligned wit...

Page 96: ...rting connector D into the slide rail the preferred and easier method is to install connector D and the latching bracket as one assembly into the slide rail b Gently tug on the left side of the CMA ba...

Page 97: ...controller Before You Begin Ensure all rack anti tilt devices are extended to prevent the rack from tipping forward when the storage controller is extended from the rack 1 Slowly pull the storage con...

Page 98: ...e Rails Installing an Oracle ZFS Storage ZS7 2 Cable Management Arm Verifying Operation of the Oracle ZFS Storage ZS7 2 Slide Rails and CMA Installing the Slide Rails onto an Oracle ZFS Storage ZS7 2...

Page 99: ...plan to move the rack after the controller is installed use mounting screws and cage nuts to secure the slide rail assembly Refer to Rail Rackmount Kit Overview and Information card for instructions...

Page 100: ...racle ZFS Storage ZS7 2 Controller onto the Rack Slide Rails Use the following procedure to install an Oracle ZFS Storage ZS7 2 controller onto the rack slide rails Caution This procedure requires a m...

Page 101: ...ensure that both the top and bottom mounting lips of the mounting brackets are inserted into the slide rail The controller should slide forward and backward easily if correctly installed If the unit...

Page 102: ...nstall the cable management arm CMA for an Oracle ZFS Storage ZS7 2 controller The CMA is an assembly that you can use to route the controller cables in the rack This procedure is completed from the b...

Page 103: ...route an excess of cables such that the CMA clamps bow or appear structurally unfit to support the weight If using two clustered controllers mounted in the middle of the rack with disk shelves locate...

Page 104: ...To make it easier to install the CMA extend the controller approximately 13 cm 5 inches out of the front of the rack 5 Take the CMA to the back of the equipment rack and ensure that you have adequate...

Page 105: ...es into the slide rail front slot callout 2 b Gently tug on the right side of the front slide bar to verify that connector B is properly seated Callout Description 1 Connector B tab 2 Right slide rail...

Page 106: ...s properly seated 9 To prepare CMA connector D for installation remove the tape that secures the slide rail latching bracket to connector D and ensure that the latching bracket is properly aligned wit...

Page 107: ...rting connector D into the slide rail the preferred and easier method is to install connector D and the latching bracket as one assembly into the slide rail b Gently tug on the left side of the CMA ba...

Page 108: ...controller Before You Begin Ensure all rack anti tilt devices are extended to prevent the rack from tipping forward when the storage controller is extended from the rack 1 Slowly pull the storage con...

Page 109: ...de Rails Installing an Oracle ZFS Storage ZS5 4 Cable Management Arm Verifying Operation of the Oracle ZFS Storage ZS5 4 Slide Rails and CMA Installing the Slide Rails onto an Oracle ZFS Storage ZS5 4...

Page 110: ...plan to move the rack after the controller is installed use mounting screws and cage nuts to secure the slide rail assembly Refer to Rail Rackmount Kit Overview and Information card for instructions...

Page 111: ...racle ZFS Storage ZS5 4 Controller onto the Rack Slide Rails Use the following procedure to install an Oracle ZFS Storage ZS5 4 controller onto the rack slide rails Caution This procedure requires a m...

Page 112: ...s of the mounting brackets are inserted into the slide rail The controller should slide forward and backward easily if correctly installed If the unit does not slide easily ensure that each mounting l...

Page 113: ...term host cables including InfiniBand Fibre Channel and Ethernet cables and up to 16 disk shelf SAS cables through the CMA Older CMAs generally before 2018 only have a maximum capacity of 12 SAS cabl...

Page 114: ...the controller as required 5 If required attach the cable hook and loop straps to the CMA and press them into place to secure the cables Note Cable hooks and loop straps are preinstalled on the CMA Pe...

Page 115: ...pping forward when the storage controller is extended from the rack 1 Slowly pull the storage controller out of the rack until the slide rails reach their stops 2 Inspect the attached cables for any b...

Page 116: ...Cable Management Arm Verifying Operation of the Oracle ZFS Storage ZS5 2 Slide Rails and CMA Installing the Mounting Brackets and Slide Rail Assemblies for an Oracle ZFS Storage ZS5 2 Controller Use...

Page 117: ...ail plate as shown 6 Position a slide rail assembly in your rack so that the brackets at each end of the slide rail assembly are on the outside of the front and back rack posts The following graphic i...

Page 118: ...do not tighten the screws completely 8 From the front of the rack set the proper width of the rails with the width spacer alignment tool 1 Chapter 7 Installing the Mounting Brackets and Slide Rail As...

Page 119: ...ler onto the Rack Slide Rails Use the following procedure to install an Oracle ZFS Storage ZS5 2 controller onto the rack slide rails Caution This procedure requires a minimum of two people because of...

Page 120: ...m out of the rack You will hear an audible click 5 The following graphic illustrates the chassis insertion and slide rail locks usage Installing an Oracle ZFS Storage ZS5 2 Cable Management Arm Use th...

Page 121: ...the CMA has flat cable covers for a 1U chassis install the 2U round cable covers provided in the accessory kit 2 To replace the flat cable covers a Remove each flat cable cover by lifting up on the ca...

Page 122: ...port the CMA and do not allow it to hang under its own weight until it is secured at all four attachment points 8 Insert the CMA s connector B into the front slot on the right slide rail until it lock...

Page 123: ...y seated 10 To prepare the CMA s connector D for installation remove the tape that secures the slide rail latching bracket to connector D and ensure that the latching bracket is properly aligned with...

Page 124: ...llow the CMA to hang by its own weight 14 Verify that the slide rails and the CMA are operating properly before routing cables through the CMA a Ensure all rack anti tilt devices are extended to preve...

Page 125: ...roller cables through the CMA s cable troughs close the cable covers and secure the cables with the six Velcro straps Route the cables through the cable troughs in this order Route the cables through...

Page 126: ...of the CMA components otherwise expansion and contraction of the CMA slide bars might be hindered when the server is extended from the rack and returned to the rack Verifying Operation of the Oracle...

Page 127: ...le ZFS Storage ZS4 4 or Oracle ZFS Storage ZS3 4 Controller onto the Rack Slide Rails Installing an Oracle ZFS Storage ZS4 4 or Oracle ZFS Storage ZS3 4 Cable Management Arm Installing the Slide Rails...

Page 128: ...oller If you plan to move the rack after the controller is installed use mounting screws and cage nuts to secure the slide rail assembly Refer to the Rail Rackmount Kit Overview and Information card f...

Page 129: ...torage ZS3 4 Controller onto the Rack Slide Rails Use the following procedure to install an Oracle ZFS Storage ZS4 4 or Oracle ZFS Storage ZS3 4 controller onto the rack slide rails Caution This proce...

Page 130: ...are inserted into the slide rail The controller should slide forward and backward easily if correctly installed If the unit does not slide easily ensure that each mounting lip is inserted properly If...

Page 131: ...guidelines Route cluster cables long term host cables including InfiniBand Fibre Channel and Ethernet Cables and up to 12 disk shelf SAS cables through the CMA Do not route short SAS daisy chain cabl...

Page 132: ...as required 5 If required attach the cable hook and loop straps to the CMA and press them into place to secure the cables Note Cable hooks and loop straps are preinstalled on the CMA Perform this ste...

Page 133: ...Chapter 8 Installing an Oracle ZFS Storage ZS4 4 or Oracle ZFS Storage ZS3 4 Cable Management Arm 8 7...

Page 134: ...Cable Management Arm Verifying Operation of the Oracle ZFS Storage ZS3 2 Slide Rails and CMA Installing the Mounting Brackets and Slide Rail Assemblies for an Oracle ZFS Storage ZS3 2 Controller Use...

Page 135: ...ail plate as shown 6 Position a slide rail assembly in your rack so that the brackets at each end of the slide rail assembly are on the outside of the front and back rack posts The following graphic i...

Page 136: ...do not tighten the screws completely 8 From the front of the rack set the proper width of the rails with the width spacer alignment tool 1 Chapter 9 Installing the Mounting Brackets and Slide Rail As...

Page 137: ...ler onto the Rack Slide Rails Use the following procedure to install an Oracle ZFS Storage ZS3 2 controller onto the rack slide rails Caution This procedure requires a minimum of two people because of...

Page 138: ...m You will hear an audible click 5 The following graphic illustrates the chassis insertion and slide rail locks usage Installing an Oracle ZFS Storage ZS3 2 Cable Management Arm Use the following proc...

Page 139: ...lace the flat cable covers a Remove each flat cable cover by lifting up on the cable cover handle b Open it 180 degrees to the horizontal position c Apply upward pressure to the outside edge of each h...

Page 140: ...hment points 8 Insert the CMA s connector B into the front slot on the right slide rail until it locks into place with an audible click frames 1 and 2 The connector B tab 1 goes into the slide rail fr...

Page 141: ...ith connector D frames 1 and 2 11 While holding the slide rail latching bracket in place insert connector D and its associated slide rail latching bracket into the left slide rail until connector D lo...

Page 142: ...ated before you allow the CMA to hang by its own weight 14 Verify that the slide rails and the CMA are operating properly before routing cables through the CMA a Ensure all rack anti tilt devices are...

Page 143: ...se expansion and contraction of the slide bar might be hindered when the server is extended from the rack and returned to the rack 18 Ensure that the secured cables do not extend above the top or belo...

Page 144: ...tipping forward when the storage controller is extended from the rack 1 Slowly pull the storage controller out of the rack until the slide rails reach their stops 2 Inspect the attached cables for an...

Page 145: ...rage 7x20 Mounting Brackets from Inside the Slide Rails Use this procedure to remove the Sun ZFS Storage 7x20 mounting brackets from inside the slide rails If the mounting brackets were not shipped in...

Page 146: ...sassembling the Sun ZFS Storage 7420 rail kit Installing the Mounting Brackets on a Sun ZFS Storage 7x20 Controller Use the following procedure to install the mounting brackets on a Sun ZFS Storage 74...

Page 147: ...sis so that the slide rail lock is at the front of the chassis and the keyhole openings on the mounting bracket are aligned with the locating pins on the side of the chassis The following graphic illu...

Page 148: ...ollowing procedure to install a Sun ZFS Storage 7420 7320 or 7120 controller onto the rack slide rails Caution This procedure requires a minimum of two people because of the weight of the chassis Atte...

Page 149: ...sembly are on the outside of the front and back rack posts The following graphic illustrates the rail assembly brackets 3 Attach each slide rail assembly to the rack posts but do not tighten the screw...

Page 150: ...as possible 9 Raise the chassis so that the back ends of the mounting brackets are aligned with the slide rail and insert the chassis into the slide rails pushing the chassis slowly until the mounting...

Page 151: ...g a Sun ZFS Storage 7420 Controller onto the Rack Slide Rails The following graphic illustrates Sun ZFS Storage 7420 chassis insertion Chapter 10 Installing a Sun ZFS Storage 7x20 Controller onto the...

Page 152: ...elf SAS cables through the CMA Do not route short SAS daisy chain cables through the CMA Do not route an excess of cables such that the CMA clamps bow or appear structurally unfit to support the weigh...

Page 153: ...the right slide rail until the connector locks into place 3 Insert the right CMA slide rail connector 1 into the right slide rail assembly 2 until the connector locks into place Chapter 10 Installing...

Page 154: ...rt the left CMA slide rail connector 1 into the rail extension on the left slide rail assembly 2 until the connector locks into place Chapter 10 Installing a Sun ZFS Storage 7x20 Cable Management Arm...

Page 155: ...the cables through the assembly attach the hook and loop straps 1 to secure the cables Then attach the right and left outer latches to support the assembly Chapter 10 Installing a Sun ZFS Storage 7x2...

Page 156: ...ended that you use a serial SP connection for system configuration and initial configuration because you can monitor progress especially during system reboots Afterwards it is recommended that you rem...

Page 157: ...erface card links must be established before configuration can proceed Ethernet cables for connecting clustered controllers are supplied If you supply your own Ethernet cables ensure the cables are st...

Page 158: ...ight through cables between two identical controllers For details about the cluster interface cards see Controller Cluster I O Ports Oracle ZFS Storage ZS7 2 Cluster Cabling Three Category 5 Ethernet...

Page 159: ...thernet ports of each controller The following figure shows cluster cabling between two Oracle ZFS Storage ZS5 4 controllers The following figure shows cluster cabling between two Oracle ZFS Storage Z...

Page 160: ...is 1 meter in length Connect the cables in the same way as described for Oracle ZFS Storage ZS5 x controllers For details about the cluster ports see Controller Cluster I O Ports The following figure...

Page 161: ...Flashing green Data activity Link Status LED Solid green Normal connection Solid yellow or off Degraded connection The following diagram illustrates the cluster Ethernet ports for Oracle ZFS Storage...

Page 162: ...ster serial and Ethernet ports for Oracle ZFS Storage ZS3 2 controllers 1 Serial Link Status LED 2 Ethernet 3 Serial 0 4 Serial 1 5 Ethernet Link Status LED 6 Ethernet Activity LED Connecting Disk She...

Page 163: ...ZFS Storage Appliance Cabling Guide Release OS8 8 x Cabling Oracle Storage Drive Enclosure DE2 24 Disk Shelves to 4X4 Port SAS 2 HBAs in Oracle ZFS Storage Appliance Cabling Guide Release OS8 8 x Cabl...

Page 164: ...1 Shelf 8 RU 35 38 6 Controller 2 RU 17 19 2 Shelf 7 RU 31 34 7 Shelf 4 RU 13 16 3 Shelf 6 RU 27 30 8 Shelf 3 RU 9 12 4 Shelf 5 RU 23 26 9 Shelf 2 RU 5 8 5 Controller 1 RU 20 22 10 Shelf 1 RU 1 4 Chap...

Page 165: ...dure to power on an Oracle Storage Drive Enclosure DE3 24P DE3 24C DE2 24P or DE2 24C disk shelf Before You Begin Ensure you have met the following electrical safety measures before applying power to...

Page 166: ...tor is not a steady green after module reinsertion and powering on contact Oracle Customer Service Related Topics Powering Off a Disk Shelf Powering Off a Controller Powering On a Sun Disk Shelf Use t...

Page 167: ...r Service Manual Release OS8 8 x Also see the Oracle ILOM documentation located in the documentation library for this software release at https docs oracle com en storage index html Related Topics Pow...

Page 168: ...owering off or removing all SAS chains from a disk shelf will trigger a kernel panic on the controller s to prevent data loss unless the disk shelf is part of an NSPF no single point of failure data p...

Page 169: ...the BUI Performing Initial Configuration BUI Performing Initial Configuration CLI For an overview of network interface configuration see Network Configuration in Oracle ZFS Storage Appliance Administ...

Page 170: ...owing settings 8N1 eight data bits no parity one stop bit 9600 baud Disable hardware flow control CTS RTS Disable software flow control XON XOFF Ensure you have completed cabling including the serial...

Page 171: ...service layer SUNW maguroZ9 done Applying service profile generic done Enabling auditing of Solaris commands done Adding stencil etc boot config conf done Adding stencil etc crypto ucrypto conf done A...

Page 172: ...your network administrator has not yet assigned the network name you chose for the appliance you can also configure your appliance using the link https 192 168 1 10 215 If you are unable to connect t...

Page 173: ...rollers IP address and netmask for the data interface two if clustered controllers DNS NIS LDAP domain name DNS IP address es NIS server IP address es NTP server IP address For LDAP LDAP server IP add...

Page 174: ...on click START If configuring clustered controllers go to step 5 If configuring a standalone controller go to step 6 5 To configure clustered controllers click CLUSTER Note Optionally click SKIP to co...

Page 175: ...Ethernet links that do not cross over each other all other controllers use two redundant serial links that form a crossover pattern and one Ethernet link Oracle ZFS Storage ZS9 2 Controller All Other...

Page 176: ...inistration Guide Release OS8 8 x For detailed information see Network Configuration in Oracle ZFS Storage Appliance Administration Guide Release OS8 8 x To create a management interface now use the f...

Page 177: ...to the Interfaces column e In the Network Interface dialog box set the following minimum interface properties Name Type a name for the interface Enable Interface Select this check box to enable the i...

Page 178: ...n with the appliance via the BUI and CLI Without a route the only means of communication with the appliance is through an Oracle ILOM connection to the SP j To configure additional routing go to step...

Page 179: ...gure routing c Click ADD The new route appears in the routing table d Click COMMIT 8 Configure the Domain Name Service DNS and click COMMIT For detailed information see DNS Configuration in Oracle ZFS...

Page 180: ...tication errors One way to ensure clock synchronization is to configure the appliance and the SMB clients to use the same NTP server For detailed information see NTP Configuration in Oracle ZFS Storag...

Page 181: ...torage in Oracle ZFS Storage Appliance Administration Guide Release OS8 8 x 12 Perform one of the following steps To register your appliance for remote support complete the fields and click REGISTER I...

Page 182: ...information see Phone Home Configuration in Oracle ZFS Storage Appliance Administration Guide Release OS8 8 x 14 If you configured clustering use following steps to failback the resources a For the se...

Page 183: ...ation of network interfaces the Domain Name Service DNS time settings name services directory services storage and remote support on the appliance using the command line interface CLI Note If installi...

Page 184: ...ices Manage devices interfaces Manage interfaces help topic Get context sensitive help If topic is specified it must be one of builtins commands general help or script show Show information pertinent...

Page 185: ...setup net routing create hostname maintenance system setup net route uncommitted set destination 0 0 0 0 destination 0 0 0 0 uncommitted hostname maintenance system setup net route uncommitted set ma...

Page 186: ...ance Administration Guide Release OS8 8 x Configure DNS Configure the Domain Name Service Subcommands that are valid in this context help topic Get context sensitive help If topic is specified it must...

Page 187: ...cified it must be one of builtins commands general help script or properties show Show information pertinent to the current context commit Commit current state including any changes abort Abort this t...

Page 188: ...gure Active Directory help topic Get context sensitive help If topic is specified it must be one of builtins commands general help or script show Show information pertinent to the current context abor...

Page 189: ...et pool pool Change current pool hostname maintenance system setup storage show Properties pool pool 0 status online profile mirror log_profile cache_profile hostname maintenance system setup storage...

Page 190: ...agement Interfaces in Oracle ZFS Storage Appliance Administration Guide Release OS8 8 x See Upgrading the Software in Oracle ZFS Storage Appliance Customer Service Manual Release OS8 8 x Related Topic...

Page 191: ...ex html Connecting to Oracle ILOM After configuring the system and performing initial configuration it is recommended that you retain a connection to Oracle Integrated Lights Out Manager ILOM located...