Oracle Field Service
Using Core Application
Chapter 3
Field Resource Activities
the current segment is the last segment of a segmentable activity, the check box is enabled by default, otherwise it is
disabled.
If the last segment is completed simultaneously with the expiration of Time to complete, the segmentable activity
is completed. However, if Time to complete is longer than the duration of the last segment, the remaining duration
is moved to the non-scheduled pool after the completion of the last segment, and the segmentable activity remains
started.
If you choose to complete only the current segment (by leaving the check box unchecked), the Time to complete field
on the End activity page shows the remaining duration of the segmentable activity. Initially, the Time to complete
value is calculated according to the following formula:
segmentable activity duration – Duration of finished segments – (current time – start time)
The Time to complete value can be adjusted simultaneously with completing a segment.
Note: Changing the Time to complete value results in recalculation of the remaining pending segments of the
segmentable activity and may cause changes to their number and/or duration.
If you choose to complete the entire segmentable activity and enable segmentable activity is finished, the Time to
complete field is replaced with the segmentable activity status field, allowing you to select either completed or not
done from the drop-down list as the final status of the segmentable activity.
The final status of a segment may be different from the final status of the entire segmentable activity. For example, a
segment can be closed as not done while the activity will have the completed status, and vice versa.
If you choose to complete the entire activity together with completing a segment that is not the last in the segmentable
sequence, all subsequent segments are deleted from the route(s).
You can set a segmentable activity as not completed in a similar manner, except the final status of the activity will be
not done.
The not done button of a started segment behaves in the similar manner, also offering an option of completing the
entire segmentable activity or setting it as not done.
Use Maps
Overview of Maps
Oracle Field Service maps help you locate stops on your route by providing visual details and driving directions.
Related Topics
•
•
•
View Route Maps When You're Offline
•
View Activity Location on a Map
•
View Directions to the Next Activity on Your Route
231
Summary of Contents for 21C
Page 1: ...Oracle Field Service Using Core Application 21C ...
Page 4: ...Oracle Field Service Using Core Application Inventory 245 Resources 252 End Your Day 263 ...
Page 6: ...Oracle Field Service Using Core Application Preface ii ...
Page 18: ...Oracle Field Service Using Core Application Chapter 2 Dispatcher Activities 12 ...
Page 73: ...Oracle Field Service Using Core Application Chapter 2 Dispatcher Activities 67 ...
Page 75: ...Oracle Field Service Using Core Application Chapter 2 Dispatcher Activities 69 ...
Page 187: ...Oracle Field Service Using Core Application Chapter 3 Field Resource Activities 181 ...
Page 204: ...Oracle Field Service Using Core Application Chapter 3 Field Resource Activities 198 ...
Page 274: ...Oracle Field Service Using Core Application Revision History 268 ...