Appendix B - 10 - PV200 Door Gasket Kit Installation
F M S P a r t N u m b e r 2 0 - 4 4 6 8
NOTE:
Before you use this instruction, make sure you have the latest revision. Check the
revision level of this document against the most current revision found at
http://www.opwglobal.com/opw-fms/tech-support/manuals-how-to-videos
. Download the
latest revision if necessary.
The 20-4468 kit contains four (4) pieces of rubber weatherstripping replacements. To install the new
weatherstripping:
WARNING:
To prevent an electrical shock hazard, de-energize the
Terminal before you do this procedure! Push the Terminal rocker switch on
the Power Supply to the
O
(Off) position.
1. Open the door of the unit.
2. Disconnect the Power Supply harness from the Main Board (J16 Connector) and remove the harness
wires from the cable clamp.
Doc. No.: M1010 Rev.: 10
Page 89 of 98
Summary of Contents for Petro Vend 200 M1010
Page 34: ...Section 8 Antenna Installation Doc No M1010 Rev 10 Page 34 of 98...
Page 36: ...Section 9 Main Board 9 1 Main Board Connections Doc No M1010 Rev 10 Page 36 of 98...
Page 43: ...11 2 PV200 Display Doc No M1010 Rev 10 Page 43 of 98...
Page 44: ...11 3 PV200 Pocket Doc No M1010 Rev 10 Page 44 of 98...
Page 98: ......