6.5 Electronic Pumps Controlled by DPC (Gasboy)
6.5.1 Install Program
The first step of installation is to define the brand of electronic pumps that will be used and the
communication parameters of each pump. The FSC3000
™
is designed to support up to eight (8) PCT
devices, but DPC is limited to the first four (4) PCTs.
Type:
Install program
Install program (or Configure program if already installed)
SELECT DPC PROGRAM TO INSTALL
1: GILBARCO / WAYNE
2: GASBOY
ENTER SELECTION: (2)
INSTALLING, PLEASE WAIT... SUCCESSFUL! (Successful should appear after installed)
**** DIRECT PUMP SETTINGS –Ver. 10.01D ****
Select pump types:
1-Gilbarco, 2-Wayne, 3-Gasboy: (1)3
Set pump communication port:
Baud: 1-1200, 2-2400, 3-4800, 4-5760, 5-9600 -> (?)5
Character size: 1-7 bits, 2-8 bits -> (1)2
Parity: 1-Odd, 2-Even, 3-None -> (2)3
**** DIRECT PUMP VERSION: 10.01D ****
Pumps: Gasboy
Baud rate: 9600, Data bits: 8, Parity: None, Stop bits: 1
6.5.2 Configure PCT # (# = 1 to 4)
The
Configure PCT #
command defines the PCT that is used for DPC.
Configure PCT # (# = 1 to 4)
Is this a K800 PCT or a PCM (Y/N)? N
Is this a UPC/DPC (Y/N)? Y
6.5.3 Configure PCT # POS # (# = PCT 1 to 4 and POS 1 to 8)
Configure PCT # POS #
PCT 1 Position 1 (Indicates the position being configured)
Enter Pump #: 1 (Enter the pump # that is connected to this PCT POS)
Enter pump's direct address (1): (Address that the pump will associate with)
Enter Pulses Per GALLONS: 100 (set to 1000)
MAX Fuel to be dispensed per transaction: 10 (Largest tank to be filled for this
pump)
Pump Sentry Options (Y/N)?: Y
Pump Sentry: ENABLED
Maximum time allowed for fueling (Minutes): 5
Maximum time allowed to retrieve pump handle (Seconds): 60
Maximum time allowed to detect first fueling pulse (Seconds): 60
Maximum time allowed between fueling pulses (Seconds): 30
Set Up Hose 1 (Y/N)? y
Enter Fueltype Code #: 1 (Enter the fuel type code)
Enter Tank #: 1 (Enter Tank number – not required for proper operation)
Clear Pump Totals (Y/N)? N
Enter Totalizer Value: 0.0 (Should set to match fueling point totalizer)
Set Up Hose 2 (Y/N)? N (Only required if pump has more than 1 grade!)
Set Up Hose 3 (Y/N)? N (Must match the pump mapping)
Set Up Hose 4 (Y/N)? N
Doc. No.: M00-051.00 Rev.: 10
Page 47 of 181
Summary of Contents for M00-051.00 FSC3000
Page 60: ...Doc No M00 051 00 Rev 10 Page 60 of 181...
Page 63: ...Doc No M00 051 00 Rev 10 Page 63 of 181...
Page 69: ...Doc No M00 051 00 Rev 10 Page 69 of 181...
Page 99: ...Doc No M00 051 00 Rev 10 Page 99 of 181...
Page 129: ...Petrol Training Screens Doc No M00 051 00 Rev 10 Page 129 of 181...
Page 130: ...CNG Training Screens Doc No M00 051 00 Rev 10 Page 130 of 181...
Page 181: ......