![OptiPro Systems eSX 300 CTS User Manual Download Page 106](http://html1.mh-extra.com/html/optipro-systems/esx-300-cts/esx-300-cts_user-manual_1643723106.webp)
User Manual – eSX
OptiPro Systems, LLC.
Page 106 of 111
Last Modified: 8/27/2014
10.1.8
Tram – Lens Probe
The purpose of this screen is to establish the location of the lens probe on the machine, and its Z-axis
position in relation to the Schunk face. This will allow the automated lens probing routines to execute
properly. The operator needs only to set the proper B-axis zero position, and rough align the lens probe
over the top of the tram ball that is placed in the Schunk. Tapping [MOVE] at the bottom of the screen
and pressing the
CYCLE START
button will move the machine to the last known alignment positions.
Once in place, tapping [ALIGN] will execute an automated probing routine. Figure 10-7 guides you
through this process.
If the old B-axis number is not correct, you can place the magnetic base indicator on the C-axis (in
Position Mode), and run it up and down in the Z-axis direction on the side of the body of the probe to
adjust the B-axis angle until the indicator dial does not move.
Figure 10-7: Tram - Lens Probe screen. This screen will find the alignment of the lens probe
10.1.9
Validation
After the Lens Probe operation is complete, tap [OK]. This will bring you back to the main SETTING page.
Tap [VALIDATE] to accept the new tram values. From here you can tap [HOME] to return to the
previously loaded job, and use your OptiPro grinding machine normally.