
Delivery, interdepartmental transport and unpacking
Version 1.0.1 - 2020-09-07
21
Translation of original instruction
DQ14 | DQ18 | DQ22
EN
D
Q
14_
D
Q
18_
D
Q
22_
GB_3
.f
m
Img. 3-1:
Img. 3-2:
3.5
First commissioning
CAUTION!
First commissioning may only take place after proper installation.
WARNING!
The use of improper tool holders or their operation at inadmissible speeds constitutes a
hazard.
Only use the tool holders (e.g. drill chuck) which were delivered with the machine or
which are offered as optional equipment by OPTIMUM.
Only use tool holders in the intended admissible speed range.
Tool holders may only be modified in compliance with the recommendation of OPTIMUM or of
the manufacturer of the clamping devices.
WARNING!
There is a danger to persons and equipment, if the first commissioning of the drilling
machine is carried out by inexperienced personnel.
We do not accept any liability for damages caused by incorrectly performed
commissioning.
22
2
334
P
10
14
11
6
DQ 18
A-A
P
10
306
194
14
DQ 14
424
27
2
14
14
6
25
P
10
DQ 22