Version 1.0 - 2020-12-10
56
Translation of original operating instruction
GT22
EN
GT22_G
B_5
-1.
fm
6.4
Inspection and maintenance
The type and level of wear depends to a large extent on the individual usage and operating
conditions. Any indicated intervals therefore are only valid for the corresponding approved con-
ditions.
Interval
Where?
What?
How?
Check
Star
t o
f wor
k
,
after
e
ach
m
a
in
ten
a
nc
e or re
pa
ir w
o
rk
Su
rfac
e g
rind
ing
ma
ch
in
e
Central lub
ricati
o
n
Fill level
Top up central lubrication on page 26
weekl
y
Se
dime
nt
ati
o
n
ta
nk
Coolant tank
Grinding sludge
Remove accumulation of grinding sludge.
wee
k
ly
Coola
n
t
Fill level, status con-
trol
CAUTION !
The coolant must be checked for
concentration, pH value, bacteria
and fungal attack at least once a
week, even when the machine is
not in operation.
PH Value measure-
ment
Check the pH value. If required, replace the
cooling lubricant.
Cooling lubricants and tanks on page 59