5-1-2 Normal Power-on Procedures
When the initial power-on procedure is done and the UPS is turned on. Press Inverter ON button on the
HMI control panel and Yes button on the pop-up window to restart the UPS. It will be turned on after 3
minutes.
Fig. 5-1-1 UPS Power-on/off Workflow
*) for 10K~30KVA models, fuses must be installed before the initial power-on operation.
Initial Power-on Procedures
:
Switch on
Switch off
Switch on
Switch off
SPS
S1
Power-off Procedures
:
Inverter status button
becomes green after
about 50 seconds
Bypass (Reserve) status button
becomes green
Switch on
Switch on
Switch off
Switch off
Switch on
*
S3
Switch on
Switch off
S2
BAT
Switch off
Press Inverter ON
Press Yes
Press Inverter OFF
Press Yes
Summary of Contents for DS 100KC33 II
Page 1: ...DS C33 II Series User s Manual www opti ups com ...
Page 14: ...U P S Fig 4 1 1c Fig 4 1 1d Fig 4 1 1e ...
Page 17: ...4 1 4 Outline and Dimension 10 15 20 30K 120V 208V 220V 380V Models ...
Page 18: ...45 60K 120V 208V Models 45 60 80 100 120K 220V 380V Models ...
Page 19: ...80 100 120K 120V 208V Models ...
Page 20: ...160 200K 220V 380V Models ...