![Opitec 110.693 Instructions Manual Download Page 5](http://html1.mh-extra.com/html/opitec/110-693/110-693_instructions-manual_1640374005.webp)
5
D110693#2
Dia.13
INSTRUCTIONS
13. Rivet the spoiler in place as shown
in Dia.13.
Note!
The direction of the spoiler
14. Place two sticky pads (26) on the
spoiler.
Dia.14
Dia.15
15. Screw the tabs on the solar cell. Set
the solar cell (7) in place Make sure the
fixings line up with the holes and the
cell is held in place by pressing it on the
pads.
16. Connect a 60mm length of red cable
(18) to an outside connection on the
switch. And a 60mm long length of
cable(18) to the middle connection on
the switch Insert the switch in place as
shown in dia. 16 .
Dia.16
17. Guide the cable from the switch and
the battery holder through the 7mm
hole in the base
Fix the cover (6) in place with 2
machine screws (20) and 2 lock nuts
( 23) see diagram 17.
Dia.17
18. Pass the cables from the motor
through the holes as shown dia.18
Then insert the white LED (12) in the
hole in 5mm hole the front fork.
Dia.18
Dia.12
11.Shorten the welding rod (3) to 95mm and
remove burr from the ends.
Assemble the gear box (8) using the above
welding rod ( rear axle ).
Use two machine screws (20) and two nuts
(22) to hold it together See dia 11a.
Note: the rear axle protrudes about 50mm
Dia.11a
12. Rivet the two supports in place on
the back of the trike.
Note!
Place this gears
carefully
as it can break !
Dia.11
50mm
Summary of Contents for 110.693
Page 8: ...8 D110693 1...
Page 10: ...10 D110693 1...
Page 12: ...12 D110693 1...
Page 14: ...14 D110693 1...
Page 15: ...15 D110693 2 a b e f g h c d Cutting pattern Scale 1 1 INSTRUCTIONS...