Statistics
117
FalconV User Manual - Standard Scanning - OPEX Corporation
Overall System Performance Measures statistics
The table below lists the terms that appear in the Overall System Performance
Measures section of the statistics report.
Table 8: Overall System Performance Measures terms
Term
Definition
Input
Number of pieces fed into the machine.
Output
Number of pieces successfully processed by the machine.
This number is figured by subtracting the number of rejects
from the number of pieces input.
Jam Rate
Number of jams per run. The formula for the Jam Rate is:
Rejects
Number of pieces rejected.
Feed Rate
Number of pieces per hour the FalconV is currently feeding.
The formula for the Feed Rate is:
Output Rate
Number of pieces per hour the FalconV is processing. The
formula for the Output Rate is:
Jam Clear
Time
Average time the FalconV was halted while the Operator
was clearing a jam. The formula for the Jam Clear Time is:
Reference
Feed Rate
Number of pieces fed into the FalconV per hour. The
formula for the Reference Feed Rate is:
Jam Rate =
Input
Jams
Feed Rate =
Input * 6600
Active Job Time (seconds)
Output Rate =
Output * 6600
Active Job Time (seconds)
Jam Time (seconds)
Jam Clear
Jams
Time (seconds) =
Reference Feed Rate =
Input * 6600
Run Time (seconds) + (Jams * Ref. Jam Clear Time (seconds))
Summary of Contents for FalconV
Page 5: ...5 FalconV User Manual Standard Scanning OPEX Corporation Performance Details statistics 119...
Page 6: ...6 FalconV User Manual Standard Scanning OPEX Corporation...
Page 82: ...82 Operation FalconV User Manual Standard Scanning OPEX Corporation Figure 24 Ending the job...
Page 110: ...110 Maintenance FalconV User Manual Standard Scanning OPEX Corporation...