22
4. Installation and Start Up
1) Inspect the packaging carton and its contents for damage. Please inform
the transport agency immediately should you find signs of damage.
Please keep the packaging in a safe place for future use.
2) Plug the UPS into a wall outlet (see figure 1), and press the
on the
front panel, then the UPS come into work. When the UPS starts, it will
beep and both LEDs of the front panel will light up for 2 seconds. The
green light should light up continuously. This indicates normal operation.
3) Let the UPS charge the battery for at least 2 hours. You may use the UPS
while the battery charges, but the UPS backup time will be reduced until
the battery is fully charged. It will take up to 8 hours to charge the fully
discharged battery.
Note:
If the UPS continues to beeps, or the green light is not alight even mains
power is available, please see the chapter Troubleshooting for more
information.
3) Switch off the equipment you want to protect, and connect it to the outlets
of the UPS.
4) Switch on the protected equipment, one piece per time.
Summary of Contents for YUNTO Q 1250VA
Page 13: ...13 7 Anhang Abbildung 2 Vorder und Rückansicht YUNTO Q 450 ...
Page 14: ...14 Abbildung 3 Vorder und Rückansicht YUNTO Q 700 ...
Page 15: ...15 Abbildung 4 Vorder und Rückansicht YUNTO Q 1250 ...
Page 28: ...28 7 Appendix Figure 2 Front and back view of YUNTO Q 450 ...
Page 29: ...29 Figure 3 Front and back view of YUNTO Q 700 ...
Page 30: ...30 Figure 4 Front and back view of YUNTO Q 1250 ...
Page 46: ...46 7 Appendice Figura 2 Vista frontale e posteriore del gruppo YUNTO Q450 ...
Page 47: ...47 Figura 3 Vista frontale e posteriore del gruppo YUNTO Q 700 ...
Page 48: ...48 Figura 4 Vista frontale e posteriore del gruppo YUNTO Q 1250 ...