![OneScreen TL6 Hardware Manual Download Page 9](http://html1.mh-extra.com/html/onescreen/tl6/tl6_hardware-manual_1635748009.webp)
9
Note: For different sizes of the screen, VESA Mounting Standards are listed in the table below
OneScreen
TL6
All your collaboration tools are right here
4. Getting Ready!
4.1 Installing the Wall mount
For mounting the unit, check the integrity of the wall, whether it can endure the load of the unit. After that, clean
the surface on which the unit is to be installed. Make sure your technician has the proper tools to install the wall
mount. Use the images below to identify the specific parts to be used in each step.
Follow the steps given below:
1. Drill holes inside the wall and hammer in the screw plugs (labelled B).
2. Level the wall plate (labelled H) on the wall and tighten using the screws (labelled A).
3. Attach the mounting arms (labelled I) on the back side of the unit properly. Fix and tighten the screws (labelled
D) using washers (labelled G) and studs (labelled C) to increase the gap for ventilation.
4. Hang the screen on the bracket. Make sure that the mounting arms are aligned properly and fix themselves on
the mount, figure 5.
5. Make sure that spacing between wall and screen is 5 cm or more for proper ventilation.
6. Finally, place a light force downward and sideways to test the sturdiness of the installation.