background image

Page 9 Total 16

III

III

III

III Preparing

Preparing

Preparing

Preparing &

&

&

& Installation

Installation

Installation

Installation

3

3

3

3

1

1

1

1 Preparation

Preparation

Preparation

Preparation Instruction

Instruction

Instruction

Instruction

1) Preparation before installation. A copy of wiring diagram and a set of Tripod turnstile

equipment should be ready.

2) The description of system function. When the system is electrified, it will go through

self-check process. After receiving card read signal, the LED access indicator will

turn green, then allow passing through. When passenger push ahead the turnstile,

the turnstile will return to zero position, Then the access indicator will turns red.

When it is automatically reset, one entry would have been done. This system allows

swiping cards for multiple times, but it allows only one entry at a time. If no one

passing by in the set time, the program will reset automatically.

3) Checking on the electric engine. Before the installation of electric engine, make sure

that the open circuit current of the electric engine should be no more than 500mA,

and make sure the starting torque of the electric engine must meet the

requirements.

4) Checking on the system. Before it is electrified, the equipment must be checked,

make sure the machine has not been stuck and operates smoothly.

5) Checking on wiring connection. Check the wiring connection of the electric engine

according to the wiring diagram, have trial electrical connection, and electrify the

system for trial run only when confirming without error.

6) Electrifying the system. Check the three limit switches first when the system is

electrified. When error occurs in anyone of these three switches, there will be

system alarm, and further operation will be allowed only when the error is cleaned.

7) Program functions testing.

Integrated testing: After learning, arms will enter to integrated testing. Arms rotate

clockwise 10 times and reversal 10times.Repeat the action.

3

3

3

3

2

2

2

2 Installation

Installation

Installation

Installation

Install turnstile on the final decorating ground. Please embedded cables and junction

boxes first under ground. At the bottom of turnstile there are two fixed panels, to fix the

location of equipment, when install equipment, fixing hole location according to the location

Summary of Contents for 2B-ATT203

Page 1: ...Page 1 Total 16 TRIPOD TRIPOD TRIPOD TRIPOD TURNSTILE TURNSTILE TURNSTILE TURNSTILE User User User User Manual Manual Manual Manual V2 4 V2 4 V2 4 V2 4 2B ATT203 2B ATT301...

Page 2: ...rd and other read write device The product can be widely used in places that require intelligentized access control such as airports metro stations libraries office buildings clubs theaters factories...

Page 3: ...Brief Introduction of the Product 4 II Operating Principle 7 III Preparing Installation 9 IV Handling Instruction 11 V Wiring Diagram 12 VI Important Notice Maintenance 13 VII Contact Information 13 A...

Page 4: ...ns it achieves access control attendance recording tolling and counting function through read write operations and storing the information being read in the microprocessor control system or the comput...

Page 5: ...ng attendance recording and identification while adopting the management software developed by our company to process the information record being read And it is one of the most special features of th...

Page 6: ...dings theaters or piers The barrier can work together with different card readers auto ticket checking system and fingerprint recognition system effectively preventing unauthorized entry The rotor tur...

Page 7: ...Main Main Main Application Application Application Application Use in pavement and automatic fare collection such as government agencies intelligent building residential area school airport subway lib...

Page 8: ...th computers through RS232 interface processing the data obtained and sending management instruction 2 2 2 2 1 1 1 1 Definition Definition Definition Definition 1 Leftward Turnstile swiping card for a...

Page 9: ...tric engine should be no more than 500mA and make sure the starting torque of the electric engine must meet the requirements 4 Checking on the system Before it is electrified the equipment must be che...

Page 10: ...ge 10 Total 16 of fixed plate Put 10 12mm anchoring into the hole diameter 13mm Open the locks in the both sides of turnstile remove side tailgates then can wiring equipment and fix it TT201 TT208 TT2...

Page 11: ...will ring and the access permit will be cancelled 4 4 4 4 2 2 2 2 Failure Failure Failure Failure and and and and Recovery Recovery Recovery Recovery Tips Tips Tips Tips The tripod turnstile has fail...

Page 12: ...tice Notice Notice Maintenance Maintenance Maintenance Maintenance 1 The casing of the turnstile is made of stainless steel materials It must be cleaned by soft fabric often and avoid cleaning with ha...

Page 13: ...further notice 8 We heartily welcome suggestions for improvement from all the users of our products 9 When errors occur in this product please contact our after sales department or our local branch i...

Page 14: ...the data data data data Transfer 0xfe 0x80 0x02 0x00 0x00 0x00 0xab Gate return code divided into a The pedestrian has been past the gate Return 0xfe 0x81 0x02 0x00 0x00 0x00 0xab b Timeout after read...

Page 15: ...Machine Machine Machine Machine Aging Aging Aging Aging Testing Testing Testing Testing Mode Mode Mode Mode 1000 1000 1000 1000 Normally Normally Normally Normally Working Working Working Working Mode...

Page 16: ...Page 16 Total 16 working mode as setting...

Reviews: