1) Preparation before installation. A copy of wiring diagram and a set of Tripod turnstile
equipment should be ready.
2) The description of system function. When the system is electrified, it will go through
self-check process. After receiving card read signal, the LED access indicator will
turn green, then allow passing through. When passenger push ahead the turnstile,
the turnstile will return to zero position, Then the access indicator will turns red.
When it is automatically reset, one entry would have been done. This system allows
swiping cards for multiple times, but it allows only one entry at a time. If no one
passing by in the set time, the program will reset automatically.
3) Checking on the electric engine. Before the installation of electric engine, make sure
that the open circuit current of the electric engine should be no more than 500mA,
and make sure the starting torque of the electric engine must meet the
requirements.
4) Checking on the system. Before it is electrified, the equipment must be checked,
make sure the machine has not been stuck and operates smoothly.
5) Checking on wiring connection. Check the wiring connection of the electric engine
according to the wiring diagram, have trial electrical connection, and electrify the
system for trial run only when confirming without error.
6) Electrifying the system. Check the three limit switches first when the system is
electrified. When error occurs in anyone of these three switches, there will be
system alarm, and further operation will be allowed only when the error is cleaned.
7) Program functions testing.
Integrated testing: After learning, arms will enter to integrated testing. Arms rotate
clockwise 10 times and reversal 10times.Repeat the action.
3
3
3
3
.
2
2
2
2 Installation
Installation
Installation
Installation
Install turnstile on the final decorating ground. Please embedded cables and junction
boxes first under ground. At the bottom of turnstile there are two fixed panels, to fix the
location of equipment, when install equipment, fixing hole location according to the location