background image

 

11/12/2009

 

4

 

of

 

4

 

www.onsemi.com

 

 

Test Procedure

 

 

The test procedure is achieved by following the sequence below step-by-step. 

 

1.  Connect the voltmeter (V) between R1/R2 midpoint and GND. 
2.  Connect the power supply (PS) between VBAT (+) and GND (-). 
3.  Turn the power supply on. 
4.  Measure the voltage on voltmeter (V). 
5.  Turn the potentiometer R2 and adjust until voltage is 

0.22V

6.  Measure the LED current (A). 
7.  The LED current must be between: 

270mA 

 

I

LED 

 

330mA

8.  Measure the supply current on the power supply. 
9.  The supply current must be between: 

90mA 

 

I

SUPPLY 

 

115mA

10.  Turn off the power supply (PS). 
11.  Disconnect the CAT4201 evaluation board. 

 

 

www.BDTIC.com/ON/

Reviews: