On-Q Legrand RJ45 Instruction/Installation Sheet Download Page 2

 

 

 
301 Fulling Mill Road, Suite G 
Middletown, PA 17057 
Phone (800) 321-2343 / Fax (717) 702-2546 
www.onqlegrand.com

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

                  

Page 2 of 2

 

INSTRUCTION/INSTALLATION SHEET 
High Performance RJ45 Modular Plug 
Hand Tool

IS-0122 REV. A

 

 

 ©Copyright 2008 by On-Q/Legrand All Rights 

Reserved

NOTE: On-Q products are designed to the EIA/TIA-568A standard 

 
d.   When the wires are arranged for the correct pin-out, slide the wires into the connector. Make sure the wire 

ends are butting against the front edge of the connector. 

 
e.   Install the cable/connector assembly into the crimp tool. Crimp the connector to force the pins into the wires and 

to engage the strain relief on the cable. 

 
NOTE: For other terminations, be certain to select proper connector and die set for cable and application. 

 
 

Figure 3 

Reviews: