• Insert screws through the bracket into the mounting surface.
Note that these screws are not in the scope of delivery.
• Tighten all four screws with a torque of 0.5 N·m.
The Box PC is mounted.
5-3-9
Wall Mount Procedure
Use the following procedure to mount the Box PC in the wall orientation.
Additional Information
• Refer to
on page 5 - 29 for grounding details.
• Refer to
on page 2 - 19 for the bracket model.
To mount the Box PC:
1
Mount the Brackets
A
to the Industrial Box PC
C
with the 6 Phillips screws
B
supplied with
the brackets.
Tighten these screws with a torque of 0.5 N·m.
A
B
C
0
15
2
Mount the Industrial Box PC with the brackets in position.
• Drill the four holes at the location where the Box PC with brackets will be mounted.
Refer to
• Position the Industrial Box PC with bracket in the mounting location.
• Insert screws through the bracket into the mounting surface.
Note that these screws are not in the scope of delivery.
• Tighten all four screws with a torque of 0.5 N·m.
The Box PC is mounted.
5 Installation
5 - 27
NY-series Industrial Box PC Without Operating System User's Manual (W586)
5-3 Mount
5
5-3-9 W
all Mount Procedure
Summary of Contents for NYB17-*100 SERIES
Page 8: ...CONTENTS 6 NY series Industrial Box PC Without Operating System User s Manual W586...
Page 30: ...Revision History 28 NY series Industrial Box PC Without Operating System User s Manual W586...
Page 40: ...1 Overview 1 8 NY series Industrial Box PC Without Operating System User s Manual W586...
Page 68: ...3 Software 3 4 NY series Industrial Box PC Without Operating System User s Manual W586...
Page 189: ...I Index I 1 NY series Industrial Box PC Without Operating System User s Manual W586 I...
Page 192: ......
Page 193: ......