background image

User Manual V2.4                                                                                                                                                       

 

 

     

 

       

 

Choose 

My network 

place

 click right hand 

button   

Left click 

Summary of Contents for Omniksol-WIFIKIT

Page 1: ...User Manual V2 4 Omniksol WIFIKIT User Manual Omnik New Energy Co Ltd ...

Page 2: ... function By connecting with inverters through RS485 interface the Kit can receive information from inverters and realize cascade of inverters One side It provides wireless function another side it may also use cable to transfer inverter data to the web server Users can monitor the runtime status of the device by checking the 4 LEDs on the panel which indicates Power RS485 Link and Status respecti...

Page 3: ...ollector and inverter 6 2 3 1 The instructions of data collector interface and connection line interface 6 2 3 2 Steps of connection 7 2 4 WiFi settings 8 2 4 1 Wireless network 8 2 4 2 Wired network 12 2 5 Debug 13 2 6 Register on monitoring website 15 2 6 1 Click Register button to go to registering interface for new account 16 2 6 2 Fill in user s information as required 16 2 7 Login the PV mon...

Page 4: ...r Manual V2 4 2 1 RS485 Card Install SOP 1 1 Disassembly Picture 1 1 1 Unscrew the four screws on the interface panel with the screwdriver as shown in Picture 1 1 1 and keep the screws aside Picture 1 1 2 ...

Page 5: ...e interface panel as shown in Picture 1 1 2 1 1 3 1 2 Installation Pick out the net cable and the water proofing connector from the package and follow the Picture A Put the net cable in from the gap B Pput the net cable one after another into the kneck of the interface panel Picture 1 2 1 ...

Page 6: ...User Manual V2 4 4 C Insert the RS485 card lightly from the position as follow picture Picture 1 2 2 D Finish the installation as Picture 1 2 3 Picture 1 2 3 ...

Page 7: ...izontal round holes which distance is 69mm in the selected position 2 Drill two φ6mm holes in the marked position the depth of the hole is not less than 30mm 3 Punch the expanded rubber tubes into the holes lightly with a rubber hammer 4 Wring two screws into the expanded rubber tubes the screws head exposed wall about 6cm 5 Hang the PV data collector WIFIKIT on the screws hold the metal part of t...

Page 8: ...nna position please note only the metal part can be screwed plastic part cannot be screwed or the antenna will be damaged in addition the unusual installation status will affect the usage of data collector more details please refer to the abnormal condition and dispose during debugging 2 3 Connection between data collector and inverter 2 3 1 The instructions of data collector interface and connect...

Page 9: ...t the other network cable connects the network interface of PV data collector WIFIKIT 4 Connect the power supply adapter to data collector then insert into the socket B Multiple inverter connection 1 Cut of the power supply of the inverter Pin NO RS485 RS422 1 NC NC 2 NC NC 3 NC RX 4 A TX 5 B TX 6 NC RX 7 GND GND 8 GND GND Line sequence of T568B 1 orange with white 2 orange 3 green with white 4 bl...

Page 10: ...inverter with the bus constitute serial LAN 6 Connect the power supply adapter to data collector then insert into the socket Picture 2 3 3 Note Must cut off the power supply before connection Please make sure that all the connections are completed and then power the inverters and PV data collectors Otherwise may cause personal injury or equipment damage 2 4 WiFi settings 2 4 1 Wireless Network Ins...

Page 11: ...User Manual V2 4 9 Choose My network place click right hand button Left click ...

Page 12: ...User Manual V2 4 10 Choose WiFi Left Double Click Enter 10 10 100 254 in your browser Connect successfully ...

Page 13: ...User Manual V2 4 11 Fill in the user name admin and password admin Left button Search Choose your regional WiFi and click Apply If your WiFi has a password click confirm ...

Page 14: ...e network cable to connect to the Ethernet port of WIFIKIT and the port of router Then the inverter info received by WiFi will be directly transferred to the remote server Note the default WIFIKIT is WiFi network if use the Ethernet port please restore to the factory default status Do not fill in Fill in the password of your wifi Whether display your password Disable or Enable Enable suggested Lef...

Page 15: ...User Manual V2 4 13 Picture 2 4 2 2 5 Debug LED indicating lamp Introductions Picture 2 5 1 ...

Page 16: ...us POWER Light The power is normal Dark The power is abnormal 485 422 Light The connection between collector and inverter is normal Flashing Data is transferring between collector and inverter Dark The connection between collector and inverter is abnormal STATUS Dark LINK Flashing Connecting WiFi STATUS Light LINK Flashing Data is transferring of WiFi LINK Light The connection of collector is norm...

Page 17: ...f there is no change in 2min please reset the collector Note1 x means the status is instability Note 2 when screw or adjusting the antenna position please note only the metal part can be screwed plastic part cannot be screwed or the antenna will be damaged Note3 If the equipment still cannot work according to the above instructions please connect your device customer service 2 6 Register on monito...

Page 18: ...mation as required Picture 2 6 2 Click and enter the register interface Picture 2 6 1 choose Owner Click and enter the configure interface Remarks please read the Omnik service agreement carefully the enclosure is the cost list for all the countries please choose your operators Owner means the final user you must fill it ...

Page 19: ...t Picture 2 6 3 Click and choose the aim pic Click OK save the pic Fill in WiFi card s S N code see pic 2 6 4 Click the map choose the installation site Select and choose it to be the share mode other user can see Finish the register ...

Page 20: ...he power station After the successful register and account activation open the login interface as below picture 2 7 1 input the correct email and code and enter the PV monitoring system then you can monitor and manage the power station Picture 2 7 1 Input the correct email and code ...

Page 21: ...se your station and enter Edit or delete the case Not yet open Back to 2 7 2 interface Enter the sharing case Enter the configure company account interface Add one case under your account same as 2 7 3 Picture 2 7 3 List of power stations Picture 7 4 Navigation Bar Reset password ...

Page 22: ...User Manual V2 4 20 Picture 2 7 5 Main interface of power station Change case Case info search Power station info Energy saving Real time power and generated energy switchover Print current figure ...

Page 23: ...User Manual V2 4 21 Picture 2 7 6 Real Time Interface Internal temperature Latest data collecting time Picture 2 7 7 History Interface Parameter options Choose the aim inverter ...

Page 24: ...User Manual V2 4 22 Picture 2 7 8 Alert Interfaces Click turn to picture 2 7 7 Picture 2 7 9 System Setting Interface The interface same as picture 2 7 3 ...

Page 25: ...the Omnik solar iPhone and Omnik Solar HD iPad at app store After the download input your user name and password then visit your station we supply a free demo for the users who do not register choose the power station and enter the main interface then you the daily energy etc will be displayed Meanwhile you can view the relevant date to view the curve as below Picture 2 7 10 System Setting Interfa...

Page 26: ...User Manual V2 4 24 Picture 2 8 1 1 Log in interface 2 Power station list interface 3 Main interface 4 Daytime curve interface ...

Page 27: ... please contact us you should confirm the follow things before contact us Device model Data collector serial number The number of connected inverter Add Xinghu Road No 218 bioBAY Park C2 Suzhou China Zip code 215213 Fax 86 512 6295 6682 Tel 86 512 6295 6676 Mail Sales omnik solar com ...

Reviews: