19
Measurement Setup
3
Measurement Setup
3.1
General
When connecting the CT to the
CT SB2
, please also observe the wiring hints
given in the CT Analyzer User Manual.
Always connect only one CT to the
CT SB2
. Disconnect and remove unused
cabling from the
CT SB2
and the CT after testing.
Using the
CT SB2
switch box, CT testing, burden measurement and primary
winding resistance measurement can be performed separately (i.e., using
separate test procedures) or together in one test sequence. Figure 3-2 and
Figure 3-3 show the basic wiring required for CT testing. To measure the burden
and the primary winding resistance together with the CT test, the additional
wiring shown in Figure 3-4 and Figure 3-5 is necessary.
The advantage of using the
CT SB2
for single-ratio CT testing is the option to
include burden and/or primary winding resistance measurement to the test
without any need for wiring changes during the test procedure. If you do not want
to perform burden or primary winding resistance measurement, you should
preferably use the normal single-ratio CT test mode of the
CT Analyzer
without
using the
CT SB2
.
If you do not use the
CT SB2
switch box for CT testing with the
CT Analyzer
, disconnect all cabling to the
CT SB2
from the
CT Analyzer
(incl. the data connection cable connected to the remote control interface
of the
CT Analyzer
).
Warning:
When measuring the ratio of transformers make sure that the test
voltage is connected to the corresponding secondary winding, and the primary
winding is connected to the according measurement input. Accidentally mixing
up the windings can cause life-threatening voltages within the transformer
and/or destroy the connected CT, the
CT SB2
or the
CT Analyzer
!
Warning:
Feeding test voltage to a tap of a multi-ratio CT can cause life-
threatening voltages on other taps with higher ratios. Always connect all
secondary taps to the
CT SB2
switch box in order to guarantee safety during
testing.
Summary of Contents for CT Analyzer
Page 1: ...CT Analyzer CT SB2 User Manual...
Page 3: ...CT Analyzer User Manual...
Page 4: ...CT Analyzer User Manual 2 Manual Version CTAnalyzerUM AE 3...
Page 39: ...37 Setup and Connection Figure 2 15 Measurement setup for delta compensation Ratio 1 L2 L3 L1...
Page 50: ...CT Analyzer User Manual 48...
Page 60: ...CT Analyzer User Manual 58...
Page 80: ...CT Analyzer User Manual 78...
Page 162: ...CT Analyzer User Manual 160...
Page 172: ...CT Analyzer User Manual 170...
Page 188: ...CT Analyzer User Manual 186...
Page 194: ...CT Analyzer User Manual 192...
Page 195: ...CT SB2 User Manual...
Page 196: ...CT SB2 User Manual 2 Manual Version CTSB2 AE 3...
Page 204: ...CT SB2 User Manual 10...
Page 206: ...CT SB2 User Manual 12...
Page 211: ...17 Hardware 1 x Cable bag Bag for cables and accessories Accessories Description...
Page 212: ...CT SB2 User Manual 18...
Page 226: ...CT SB2 User Manual 32...
Page 242: ...CT SB2 User Manual 48...
Page 248: ...CT SB2 User Manual 54...
Page 250: ...CT SB2 User Manual 56...
Page 252: ...CT SB2 User Manual 58...