23
Measurement Setup
3.5
Additional Wiring for Burden Measurement
Burden measurement may be performed separately or in conjunction with CT
testing and/or primary winding resistance measurement.
The following wiring is required for burden measurement (in addition to the basic
measurement setup shown in Figure 3-2 and Figure 3-3 and/or the additional
wiring for primary winding resistance measurement shown in Figure 3-5, as
required).
Figure 3-4
Additional wiring required for burden measurement
X1
X2
X3
X4
X5
X6
*
*
Burden
Basic CT wiring,
see Figure 3-2 or Figure 3-3
CT
*
For information how to connect the communication link between the
CT SB2
and the
CT Analyzer
, please refer to section 3.2 on page 20.
Summary of Contents for CT Analyzer
Page 1: ...CT Analyzer CT SB2 User Manual...
Page 3: ...CT Analyzer User Manual...
Page 4: ...CT Analyzer User Manual 2 Manual Version CTAnalyzerUM AE 3...
Page 39: ...37 Setup and Connection Figure 2 15 Measurement setup for delta compensation Ratio 1 L2 L3 L1...
Page 50: ...CT Analyzer User Manual 48...
Page 60: ...CT Analyzer User Manual 58...
Page 80: ...CT Analyzer User Manual 78...
Page 162: ...CT Analyzer User Manual 160...
Page 172: ...CT Analyzer User Manual 170...
Page 188: ...CT Analyzer User Manual 186...
Page 194: ...CT Analyzer User Manual 192...
Page 195: ...CT SB2 User Manual...
Page 196: ...CT SB2 User Manual 2 Manual Version CTSB2 AE 3...
Page 204: ...CT SB2 User Manual 10...
Page 206: ...CT SB2 User Manual 12...
Page 211: ...17 Hardware 1 x Cable bag Bag for cables and accessories Accessories Description...
Page 212: ...CT SB2 User Manual 18...
Page 226: ...CT SB2 User Manual 32...
Page 242: ...CT SB2 User Manual 48...
Page 248: ...CT SB2 User Manual 54...
Page 250: ...CT SB2 User Manual 56...
Page 252: ...CT SB2 User Manual 58...