TYPICAL APPLICATION

Figure 2: Load monitoring using a current

 transformer and the DRG-SC-AC

Figure 1: DRG-SC-AC Factory Calibration:

0-500mVAC, 4-20mA

Warning: Do not attempt to
change any switch settings
with power applied.  Severe
damage may occur!

Figure 3: Wiring Diagram for DRG-SC-AC

Figure 5: Mechanical Dimensions for DRG-SC-AC

CALIBRATION

1. After configuring the DIP
switches, connect the input to a cali-
brated AC source.  Connect the
output of the actual device load (or a
load approximately equivalent to the
actual device load value) and apply
power.  Refer to the Terminal Wiring
Diagram. (Figure 3)

NOTE: to maximize thermal stability, fi-
nal calibration should be performed in the
operating installation, alllowing approxi-
mately 1 to 2 hours for warm up and
thermal equilibrium of the system.

2. Set the calibrator to the desired
minimum and adjust the zero poten-
tiometer for the desired minimum
output.

3. Set the calibrator to the desired
maximum and adjust the span poten-
tiometer for the desired maximum
output.

4. Repeat steps 2 and 3, if necessary
for best accuracy.

Figure 1: DRG-SC-AC Input Range Selector-Switch Settings

Figure 2: DRG-SC-AC Output Range Selector-Switch Settings

Figure 3: DRG-SC-AC Input Jumper Settings