background image

TACm - Installation and operating manual 

 

 3 

201

9

1219

 

Technical data 

 

SIZES 

ADSORBER 

HOUSING 

CONN. 

SIZE

 

FLOW CAPACITY* 

DIMENSIONS 

ACTIVATED 

CARBON 

VOLUME 

WEIGHT 

 

[inch] 

[m

3

/h] 

[scfm] 

A[mm] 

B[mm] 

C[mm] 

[kg] 

[l] 

[kg] 

TACm 6 

G 3/8”

 

3,5 

492 

164 

130 

0,5 

1,3 

TACm 12 

G 3/8”

 

12 

7,1 

687 

164 

130 

2,2 

5,5 

TACm 23 

G 3/8”

 

24 

14,1 

1077 

164 

130 

1,8 

3,9 

8,2 

TACm 35 

G 3/8”

 

36 

21,2 

1466 

164 

130 

2,7 

5,6 

11,1 

TACm 56 

G 1/2”

 

60 

35,3 

1082 

212 

160 

4,8 

10 

17,4 

TACm 70 

G 1/2”

 

75 

41,1 

1277 

212 

160 

5,8 

12,2 

20,3 

TACm 105 

G 1/2”

 

105 

61,8 

1677 

212 

160 

16,6 

26 

* Refers to 1bar(a) and 20

°

C at 7 barg operating pressure and inlet temperature 20

°

 

 
TECHNICAL SPECIFICATION 

Operating temperature 

1,5 - 50 

°C

 

35 

 122 

°F

 

Operating pressure

 

0 - 16 bar(g) 

0 - 232 psi 

Oil vapour content (nominal)

(1) 

< 0,003 mg/m

3

 

 

(1)

at inlet concentration < 0,01 mg/m

3

, liquid content should be removed in advance by  

fine coalescing filtration 
 
 
 
 
 
 
 
 
 
 
 

 

MATERIALS 

Housing material 

Aluminium 

Fittings, Screws 

Steel (Galvanized, Stainless) 

Sealing 

NBR 

Outside protection 

Powder paint coated (Epoxy-polyester base) 

Lubricant 

Shell cassida grease RLS 2 

 
 

 

 

 

 

 

Summary of Contents for TACm Series

Page 1: ...tions carefully before installing the product Trouble free and safe operating of the product can only be guaranteed if recommendations and conditions stated in this manual are respected 20191219 Insta...

Page 2: ...2 20191219 Components Part 1 Body filled with AC 2 Rod with thread 3 Cap nut 4 Top cover 5 Bottom cover 6 Legs 7 Screw 2 3 4 5 1 6 7...

Page 3: ...Cm 70 G 1 2 75 41 1 1277 212 160 5 8 12 2 20 3 TACm 105 G 1 2 105 61 8 1677 212 160 8 16 6 26 Refers to 1bar a and 20 C at 7 barg operating pressure and inlet temperature 20 C TECHNICAL SPECIFICATION...

Page 4: ...instructions shall apply for operating the tower The tower has been constructed in accordance with the generally recognized rules of engineering It complies with the requirements of directive 2014 68...

Page 5: ...es All installation and maintenance work on the tower may only be carried out by trained and experienced specialists It is forbidden to carry out any kind of work on the tower and piping including wel...

Page 6: ...uine parts is not covered by Warranty or Product Liability Installation Place the tower on suitable straight surface or pedestal If needed or requested fix it with screws through holes in tower s legs...

Page 7: ...NING OUTLET VALVE Opening of the outlet valve should be done extremely slowly especially when the system downstream of the valve is not pressurized Follow the procedure Open the outlet valve slightly...

Page 8: ...nce The unit was not operated properly and appropriately The unit was operated when it was clearly defective Non original spare parts or replacement parts were used The unit was not operated within th...

Page 9: ...allation and operating manual 9 20191219 OMEGA AIR d o o Ljubljana Cesta Dolomitskega odreda 10 SI 1000 Ljubljana Slovenia Tel 386 0 1 200 68 00 Fax 386 0 1 200 68 50 E mail info omega air si www omeg...

Reviews: