background image

2

Page

-------------------------------------------------------------------------------- 3

--------------------------------------------------------------------------- 3 - 4

---------------------------------------------------------------------- 4 - 5

-------------------------------------------------------------------------------------------- 5

--------------------------------------------------------------------------------------------- 6

----------------------------------------------------------------------------------------- 7

------------------------------------------------------------------------------ 8 - 9

---------------------------------------------------------------------------- 10

---------------------------------------------------------------------------- 13

Table of Contents

Section

General Information

Safety and Warranty

Technical Specifi cations

Installation

Operation

Maintenance

Parts Breakdowns

Electrical Schematics

Warranty Registration

Model DAL06

15

Summary of Contents for DAL-06

Page 1: ...s in North America Europe and Asia our global footprint continues to expand as we hold to the principle that clients bene t from the accessibility and familiarity of our sales team In 2013 as our geog...

Page 2: ...5 6 7 8 9 10 13 Table of Contents Section General Information Safety and Warranty Technical Speci cations Installation Operation Maintenance Parts Breakdowns Electrical Schematics Warranty Registratio...

Page 3: ...unit in operation NEVER lift the lid before being sure the plate Pic 1 6 is has completely stopped The plate must be properly tted onto the central shaft pin Pic 2 2 BE CAREFUL when handling the plate...

Page 4: ...card at the perforation and then send to the address speci ed below You can also register online by visiting OMCAN INC PRODUCT WARRANTY REGISTRATION 3115 Pepper Mill Court Mississauga Ontario Canada...

Page 5: ...ust be installed on a at non skid work surface During peeling operation the food product must be wet by means of 3 4 inlet pipe Pic 1 1 An alternative is to place the machine below a 3 4 water faucet...

Page 6: ...ED ONTO THE CENTRAL SHAFT PIN First check if the lid Pic 1 4 is properly tted on the top of the unit To start the machine toggle the switch Pic 1 2 to the ON position Let the water ow into the chamber...

Page 7: ...FF and disconnect it from power source 2 Wait until the plate is completely still 3 To lift the plate out of the cylinder pull it upwards 4 Wash the machine and the plate with water and neutral soap 5...

Page 8: ...9 5 ELECTRICAL SWITCH CABLE 05193 4 MB 05504 2 COMPLETE MOTOR SUPPORT DB 06 08252 0 Descrip on Item No NIPLE SET REDUCTION 09240 1 TUBO TERMO ENCOL 1 4x20mm 09534 6 ID LABLE MOTOR RESIST 10204 0 SCREW...

Reviews: