background image

8

Installation

Operation

VENTILATION

•  The area in which the appliance is to be installed should have sufficient fixed ventilation to comply with the 

local regulations.

• 

Ventilation hood must be installed above the appliance according to all appliance codes by your local and 

state health and fire regulations.

•  It is required that the Tandoor be interlocked to the hood ventilation system.

•  There must be sufficient low-level ventilation to ensure that the appliance has a good supply of clean fresh 

air.

START UP AND OPERATION

All appliances are operationally checked and adjusted before leaving our factory. These adjustments are made 

to verify effective operation and that the appliance meets the requirements of the standards. At the installation 

site making sure all local codes are met is the responsibility of the installer.

USER INSTRUCTIONS

•  Type of Charcoal to be used – Hardwood Lump Charcoal or Lump Wood Charcoal or Wood for best results.

•  Application of the Tandoor Liquid Oil – One small jar of the Tandoor Liquid Oil is provided with the Tandoor. 

Take 50gm of the oil and mix with plain yoghurt. Then take a brush or a cloth and dip in the mixture and 

from the bottom of the clay pot to the top, including the mouth, mop this mixture all over the clay thoroughly, 

then proceed with the First Burn.

•  First Burn – This must be done to cure the Clay pot so that it does not break up during operation. After 

applying the Tandoor Liquid Oil, place 1 to 1.5 kgs of hardwood lump charcoal in the bottom of the tandoor, 

ensure that the lid on the top is left off and the vent door is open, then light the charcoal and let it burn for 

several hours (3-4 hours) or until the charcoal burns out. During this procedure the mouth of the Tandoor 

should be completely exposed. DO NOT cover the opening with the stainless-steel lid. Do not be alarmed if 

you see small fissures appear on the clay surface it will not affect the performance of the Tandoor.

•  Always ensure that the tandoor is positioned on a flat surface and that the floor is of a non-combustible 

surface.

• 

The temperature of the tandoor can be adjusted by opening and closing the vent at the bottom of the 

tandoor or moving/adjusting/removing the lid at the mouth of the tandoor.

•  Let the charcoal burn out naturally, do not use water to extinguish the fire.

WARNING - after the operation the appliance will remain hot for some time, therefore, to avoid injury, 

care should be taken to prevent contact with hot surfaces.

Summary of Contents for 28X30-C

Page 1: ...02 2022 Toll Free 1 800 465 0234 Fax 905 607 0234 Email service omcan com www omcan com Charcoal Clay Tandoor Ovens Models CE IN 24X24 C 28X30 C 32X32 C 34X34 C Items 47438 47439 47441 47442 Instruct...

Page 2: ...Contents Section General Information Safety and Warranty Technical Specifications Installation Operation Maintenance Replacement Parts Notes Warranty Registration Model CE IN 24X24 C Model CE IN 28X30...

Page 3: ...e It s of the utmost importance to save these instructions for future reference Also save the original box and packaging for shipping the equipment if servicing or returning of the machine is required...

Page 4: ...ue exterior Habra el carton para asegurararse que todos los articulos solicitados sten dentro de la caja y no encuentre da os ocultos en la m quina Si el paquete ha sufrido un manejo de poco cuidado g...

Page 5: ...jury or death Read the following installation operation and maintenance instructions thoroughly before installing or servicing this equipment DISCLAIMER OUR CLAY POT INTEGRITY IS RELIANT ON THE WAY IT...

Page 6: ...conform to local codes Exercise extreme care in handling metal parts Do not touch any metal or other surfaces that become hot in operation NO ATTEMPT SHOULD BE MADE TO OPERATE THIS APPLIANCE DURING AN...

Page 7: ...y outward prying Make sure the unit is in the upright position before starting to un crate Before fixing the appliance in place remove all protective plastic coating from the unit Oven is on 6 150mm w...

Page 8: ...th and dip in the mixture and from the bottom of the clay pot to the top including the mouth mop this mixture all over the clay thoroughly then proceed with the First Burn First Burn This must be done...

Page 9: ...s attached to the side The claypot must be very cool when this is being done and applied To prepare the saltwater solution use one tablespoon of salt with one litre of lukewarm water Squeeze out any e...

Page 10: ..._______________ ________________________________________________________________________________________ ________________________________________________________________________________________ ______...

Page 11: ...ter online by visiting OMCAN PRODUCT WARRANTY REGISTRATION 3115 Pepper Mill Court Mississauga Ontario Canada L5L 4X5 https omcan com warranty registration or email to service omcan com Purchaser s Inf...

Page 12: ...relations avec nos clients et les fabricants de valeur Aujourd hui avec des partenaires en Am rique du Nord Europe Asie et Am rique du Sud nous travaillons continuellement am liorer et d velopper l e...

Reviews: