![OMC AD20 Installation, Operation And Maintenance Manual Download Page 4](http://html1.mh-extra.com/html/omc/ad20/ad20_installation-operation-and-maintenance-manual_3916189004.webp)
Installa on, Opera on and Maintenance Manual TD10/…
‐
en Rev.10/2020
Page 4
Our products a
re manufactur
e
d und
er ISO-9001 Qua
lit
y
As
suranc
e S
y
st
e
m
, approve
d
b
y
CSQ certifie
d
under n
o
.91
9
0
.OMC2 - F
IRST
ISS
UE 1994/08/04
OMC S.p.A: Via G. Galilei, 18 - 20060 - Cassina de Pecchi (MI) - ITALY - www.omcvalves.com - Tel.: (+39) 02.95.28.468
ENGLISH
1.09 TOOLS AND CONSUMABLE PARTS
Before starting the work, make sure to have at your disposal all the tools required to perform it, do not make use
of inappropriate tools. Use only OMC original spare parts.
1.10 PROTECTION CLOTHES
Take account of whether you and/or others need some clothes against the hazards, such as chemical products,
temperatures, radiations, noise, fall of objects, risks for eyes and face.
1.11 QUALIFICATION OF THE OPERATORS IN CHARGE OF THE WORKS
All works must be performed and supervised by some skilled, trained and competent personnel.
1.12 HANDLING
Use suitable lifting means for the handling of the products by assessing all the risks concerning the lifting, the
environment load, the individual and the circumstances of the work which is about to be performed.
CORRECT
WRONG
1.13 FREEZING
Protect the products against frozen in environments with temperatures lower than the freezing point of the
process fluid.
1.14 OTHER RISKS
During the operation, the external surface of the product can be at temperatures which are hazardous to touch.
Take account of this risk.
1.15 DISPOSAL
For the disposal respect the legislation in force in the State/Country/Nation where the product should be disposed
of.
1.16 RISK OF CORROSION AND/OR EROSION
Periodically verify any phenomena of internal and/or external corrosion and/or erosion as they may
significantly damage the pressurized parts by locally reducing the thickness and as a consequence the
safety degree.
CORRECT