background image

Page

 3

 from

 5

INSTALLATION INSTRUCTIONS

Step 1. 

Remove the diffusor. Place a flat blade screwdriver and pull the reflector gently (with 

opposite orientation in relation to the plastic base).   

Step 2. 

Install the included plastic cover in to the unused hole and install the base plastic (with 

the included mounting screws and plugs). 

 

Step 3. Always use in any case round mains cable

,

 with a diameter

 

of 

6-9

mm (H05RN-F 

type 2x1mm² 

or 

any 

other type

,

 

at least 

equal 

to it’s mechanical and electrical properties).   

ATTENTION!! The cable must not be deformed in any way (This requirement is important 
to ensure the tightness isolation IP65). 

Install

 

the cable gland

,

 pass the round cable thru

 

and 

tighten it all the way. When fastening the cable gland retain the main body of the gland in a 
steady position and rotate only the internal plastic screw, this will prevent the rubber grommet 
from being damaged. 

Step 4. 

Place the battery’s connector to the corresponding connector on the P.C.B

Step 5. 

Connect the mains cables to the respective terminal block 

(

connect the ground wire if 

required)

Ν 

for neutral

L for Live Wire

 

and L1 for the maintained operation

.

 

The 

L

1

 

wire 

can be connected

 

to an external switch to control the maintained or non maintained operation of 

the luminaire

For permanent maintained operation use two wires to power the luminaire, 

Ν

 

for 

neutral and 

L

 for Live Wire, and Link the 

L

 and

 

L1

.

Step 6. 

Install the

 

included tie (if needed) to fasten securely the power cables.

Step 7. 

Refit the reflector and fasten the two small screws (included).

Step 8. 

Finally place the diffusor by using the 4 screws (tightening torque 1.2Nm)

.  

Step 9. Manual TEST or Resetting Errors

In order to test or reset the device you must carefully remove the diffusor by unfastening the 4 
mounting screws. Then push the button as described in the according paragraphs on page 1 and 
2. 

NOTE!! After finishing the installation you must power the luminaire at least for 24 hours 
for battery charging to perform the nominal autonomy.

92

3

9390

16

_09_00

7

L1 L N

1

7

2

3

5

8

6

9

8

4

Reviews: