background image

Page

 

3 from

 6

INSTALLATION INSTRUCTIONS

3

2

1

   

Untighten the screw but do not remove it and pull up the reflector.

2   

Always use in any case round mains cable

,

 with a diameter

 

of 5

-

10mm (H05RN-F type 2x1mm² 

or 

any 

other type

,

 

at least 

equal 

to it’s mechanical and electrical properties). ATTENTION!! 

The cable must not be deformed in any way (This requirement is important to ensure the 

ΙΡ 

rating).

 Install

 

the included gaskets in to the cable entry holes 

(verify that are not deformed)

. Make a 

hole in the center by using a small screwdriver. Pass the round cable through the gasket. Detach the 
power terminal, connect the wires as shown in the picture and attach the power terminal 

(10A max)

If 

you  use  a  module  pass  the  2  signal  cables  on  the A,  B  terminals

  Minding  the  correct  polarity. 

Depending on the module that will be used, the cables that will be used, have different names. In A, 
L, C are also connected, while signals -L, NC/NO in the terminal B.

3  Place the battery’s connector to the corresponding connector on the P.C.B.

  

4

   

 Refit the reflector (mind the correct orientation), tighten the screw securely and the luminaire   is 

ready for mounting

.

NOTE!!   After finishing the installation you must power the luminaire for at least 24 hours in 
order to completely charge the battery. The rated autonomy duration can be achieved after that 
time.

Battery replacement

It can be done only by a competent person and after the mains interruption.

1. Remove the luminaire from the suspended ceiling (figure 3).

2. 

Follow the step 

1

 of the installation 

instructions

.

3

. Disconnect the connector and remove the old battery.

4

. Connect the new battery with the same type (step 

2

 of the installation 

instructions

) and place it in

    

the position of the old one.

5. Replace the removed parts (step 1 and 4) and power the device. 

Important notice for the installed luminaires in one area !!!

The installer must connect the battery’s connector first and then should power the luminaire.
The time between batteries connection must be, at least 1.5 minute. 
With this variation, it is ensured that the non synchronized Automatic Autonomous Test for two or more 
luminaires installed in one area, is not conducted in the same day.    

1

1

Cable 
entry
hole

92329300

4

_09_00

4

Reviews: