Safety requirements before the operation 

 

Check the operability of flexible power cord, plugs, connecting cables. 

 

Clean the device from the dust with a dry, clean cloth. 

 

Check the operability of electrical socket.

 

Safety requirements during the operation 

 

Load the device in accordance with the requirements of the instructions. 

 

Do not allow a work with the electrical appliances by unauthorized persons. 

Safety requirements in emergency situations 

 

In case of fire, short circuit, turn off the electrical appliances from the network with dry 

hands; inform the administration, office manager and electrician. 

 

In case of fire inform the administration and the fire service, take action to extinguish it. 

Safety requirements at the end of the operation 

 

Unplug the device from the network; do not pull the power cord over. 

 

Prevent the impact of hot liquids on cables, power cords, and the drop of heavy objects on 

them.

 

 

 

Do not clean with sharp objects. 

9.

 

Technical service 

9.1 General instructions 

For the technical service: 

The warranty period for repaired electrical appliance is calculated from the date of issuance of the 

repaired electrical appliance to the customer, and is considered valid in compliance with the rules of 

operation of the electrical appliance by the customer. 

During  the  warranty  period,  established  by  the  repair  company,  repeated  repair  of  the  electrical 

appliance is carried out by the repair company, except the costs of assembly units and parts paid by 

the customer, which are not replaced during the previous repair. 

When a repeat repair is necessary during the warranty period, established by the repair company, 

the warranty period is extended for the period from the date of appeal to the repair company to the 

date of acceptance of the work - issuance of electrical appliance.

 

Summary of Contents for X Band Up/Downconverter

Page 1: ...PASSPORT X Band Up Downconverter Yerevan 2016 OLYMP Engineering LLC Add Armenia Yerevan 0051 Hovsep Emin 123 EIF entrance Postal Code 0051 Attn Orbel Sevoyan Tel 374 93688597 ...

Page 2: ...rpose of the product 3 4 Technical specifications 3 5 General view of X Band Up Downconverter 5 6 Completeness 7 7 Description and operation of the product 7 8 Safety requirements 10 9 Technical service 11 10 Environment 12 11 Manufacturer s warranty 12 12 Transport and Storage 12 ...

Page 3: ... the front panel has four RF inputs and three RF outputs 1 input for the unit control indicators and a network switch The back panel of the unit has a connector for the power supply programming port and a grounding bolt 2 4 X Band Up Downconverter meets the safety requirements of Russian State Standard for electrical mechanical and fire safety GOST R IEC 60950 3 Purpose of the product This X Band ...

Page 4: ... SMA female Upconverter Specifications 14 Input Frequency Fixed at 1GHz or Variable in 1 5GHz 15 Output Frequency 8 12 GHz 16 Bandwidth 200 MHz 17 Output Power Control Range 100 dB 18 Input Power 50 dBm to 0 dBm 19 Amplitude Flatness 0 5 dB 20 Spurious in 200MHz BW Better than 50dBc 21 Residual LO Power 60 dBm 22 VSWR Better than 1 5 1 23 Noise Figure 15 dB 24 Impedance 50 Ohm 25 Attenuation Range...

Page 5: ...0 V 31 Operating Temperature 00 550 C 32 Size 482 6 X 369 7 X 88 1 mm 33 Weight 4 kg 5 General view of X Band Up Downconverter a b c d Fig 1 General view of X Band Up Downconverter 5 1 Dimensions Dimensions of X Band Up Downconverter Height 88 1 mm Length 482 6 mm Width 369 7 mm Weight of the product without packaging is not more 4 kg ...

Page 6: ...6 a b c Fig 2 Dimensions of X Band Up Downconverter ...

Page 7: ...port PROG 1 pc 3 Power supply cable 220 V 1 pc 7 3 Getting Started It is necessary to do all connections as shown in the scheme First of all you need to connect the grounding screw and then do all connections and in the end you need to connect the power cord 7 4 The overall block diagram of the system is shown below 220 V C1 C3 C2 C4 C5 C6 C7 C8 C9 U1 U2 U3 GND VHCDI Up RF In Up RF Out Down RF In ...

Page 8: ... the cable C3 4 Connect the PRF connector of DUT to the PRF connector of X Band Up Downconverter with the cable C4 5 Connect the LO OUT connector of VST RF OUT 0 to the LO IN connector of VST RF IN 0 with the cable C5 6 Connect the RF OUT connector of DUT to the DOWN RF In connector of the X Band Up Downconverter with the cable C6 7 Connect the RF OUT connector of the VST RF OUT 0 to the Up RF Out...

Page 9: ...ctors of X Band Up Downconverter In the Table 3 are shown the X Band Up Downconverter components Table 3 No Type of the connector X Band Up Downconverter 1 Case of the product 2 Power switch 3 VST VHCDI connector VHCDI ...

Page 10: ...ND M6 screw In the Table 4 are shown VST connector types Table 4 VST RF IN SMA Female RF OUT SMA Female LO IN SMA Female LO OUT SMA Female LO IN SMA Female DIGITAL I O VHCDI 7 6 Operating procedure The first step of the operation is to turn on the PXI System with VST and then the VST transceiver and the DUT After that pressing the PWR button turn on the X Band Up Downconverter 8 Safety requirement...

Page 11: ... power cord over Prevent the impact of hot liquids on cables power cords and the drop of heavy objects on them Do not clean with sharp objects 9 Technical service 9 1 General instructions For the technical service The warranty period for repaired electrical appliance is calculated from the date of issuance of the repaired electrical appliance to the customer and is considered valid in compliance w...

Page 12: ...elated to troubleshooting including business trips air travel in both directions residence and other expenses of professionals stay etc 12 Transport and Storage Transport and storage terms of X Band Up Downconverter correspond to 1 Terms of transportation in the part of impact Motor transportation with a total amount of overloads no more than four on roads with asphalt and concrete covering a dist...

Page 13: ...f the impact of diffused solar radiation and moisture condensation 2 Terms of storage in the part of impact of climatic factors heated and ventilated storehouses with air conditioning located in any macroclimatic regions warehouse with humidity control warehouse with temperature and humidity control ...

Reviews: