Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 12
24.
Locate all Post Skirting pieces. Position 2 post skirtings around the base of post as shown above
.
Use 1 Post Skirting with Cleat - 1 1/2” x 9” x 10” (Part J)
and a
Post Skirting with Dado Cut - 1
1/2” x 9” x 10” (Part K)
initially. Cleat piece should be aligned opposite post mount hardware and dado
piece aligned with post mount bolts (hardware).
Post Skirtings with Dado Cut (K)
Post Skirtings with Cleat (J)
25.
With your helpers assistance, screw Part J & K pieces together with
2 - 2” screws
at pre-drilled
locations. Make sure pieces are aligned on edges and top and bottom. Cleated skirting piece are
pre-drilled. Complete remaining skirting pieces around the post. Position skirting unit evenly around post.
Secure to post by screwing
1 - 2 1/2” screw
into the center of each cleated skirting piece (J).
Post
Skirting
Caps (L)
Post mount bolts.
26.
Position
Post Skirting Caps - 1 1/2” x 2 1/2” x 10 5/8” (Part L)
on top of skirting unit and
against post. Do a dry run first to confirm fit. There will be a small gap between post and inside of cap.
Attach caps down into skirting tops with
3 - 2” Stainless Steel Finishing Nails
per piece. Complete
remaining post skirtings.
Dado cut.
Skirting
with cleat.
Dado cut
skirting.
2” screw.
Same height.
small gap.
2 1/2” screw.
2” SS Nails.