
74.
To reduce possible water from penetrating into the window cavity,
caulk gap on both sides of window opening prior to installing
Window
Insert.
Position insert in cavity and screw with
6 - 8 1 1/4” Screws
.
On sides, make sure to screw insert into the thick butt of the siding only.
75.
Once Insert is attached,
caulk the “triangular gap”
between the Insert’s outside
flange and the siding. Also put
a bead of caulking horizontally
at top of window where the
flange and siding meet.
This additional caulking will
also will reduce the chances
of moisture entering into your
shed.
Caulk
gap.
Window
frame.
Siding Butt
Screw insert into
bottom (thick)
part of siding.
Thick butt of siding
Caulk
gap.
Lower
interior
door stop.
73.
Attach upper and lower
Vertical Interior
Door Stops
as per
Step 72
. Position against
door jamb and underneath upper door trim. Attach
with
4 - 1 1/2” Finishing Nails
per piece.
Complete both sides.
Door
Jamb.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 35