background image

14.

 

Position 

2C

 

- Door Header - Short

 on top 

of wall stud so it is flush on the inside with 2x3 
wall stud. Attach by screwing down into top wall 
framing with 

3 - 3” Screws

.

Parts (Step 14 - 15)

 

2C - Door Headers - Short 

(2” x 3 1/2” x 26 1/4”) 

x 2

 

2D

 

- Door Header - Long

 

(2” x 3 1/2” x 84”) 

x 1

 

Hardware (Step 14 - 15) 

S4

 

- 3” Screws

  

x 10 total 

S2

 

- 1 1/4” Screws

  

x 4 total

Step to front  
and top.

Align flush 
outside with 
wall siding.

15.

 

Attach 

2C

 

- Door Header - Short

 to other side. Position and attach 

2D

 

- Door Header - Long 

between short door headers. The Long Door Header has an aluminum strip attached to the back for added 
support. Attach by screwing down into wall framing with 

2 - 3” Screws 

per side. Fasten aluminum strip to 

short headers with 

2 - 1 1/4” Screws

 per side.

Aluminum strip on back 
of Long Door Header.

Door Header 
overhangs 
inside wall 
framing by 1/2”.

  Toll Free 1-888-658-1658              www.outdoorlivingtoday.com        [email protected]

Page 14

Summary of Contents for GS124-SLIDER-METAL-AK

Page 1: ... Points and Other Considerations Our products are built for use based on proper installation on level ground and normal residential use Please follow the instruction manual when building your shed and retain the manual for future maintenance purposes Customers are responsible for ensuring a solid level well draining site for construction Please check with your local municipal or county by laws bef...

Page 2: ...e on the type of foundation you will be using Concrete slab or 4 6 inches of crushed gravel with paver stones or 4x4 stringers You can find the footprint for your shed on Page 3 of your Assembly Manual If doing the assembly yourself have all the necessary tools ready to go and in working condition A list of required tools can be found after the parts list One helper is recommended to assist in cons...

Page 3: ... of floor frame Saves money on materials easy to level and work with Gravel with Patio Paver Stones Excavate at least 6 deep and 6 wider than floor frame on each side 1 2 Cubic Yards of gravel required approximatley 11 wheelbarrows 21 patio pavers 8 x 8 or larger Center patio paver stones underneath floor runners and underneath seams in floor joists Patio paver stones are widely available from mos...

Page 4: ...enders 2G 2 45 Angle Wall Extenders Left Right 2H 3 9 x 45 Wall Extenders 2I 3 1 1 2 x 2 1 2 x 42 3 8 Wall Extender Cleats Wall Cleats 2J 1 x 3 x 84 Horizontal Wall Cleat Long 2K 2 x 3 x 26 Horizontal Wall Cleats Short 3 Rafter and Roof Section Rafters 3A 9 1 x 2 x 54 Rafters 3B 4 x 3 x 48 Front Rear Soffits Left Right 3C 2 x 3 x 45 Front Rear Soffit Center Roofs 3D 4 x 1 x 21 5 8 Batten Spacers 3...

Page 5: ...x 78 Rear Corner Trims 4O 2 x 2 x 80 Side Rear Corner Trims 4P 2 x 2 x 78 Rear Middle Trims 4Q 2 x 2 x 7 Front Middle Trims Facia 4R 2 x 5 x 54 1 8 Side Facia Angle Cut Ends 4S 4 x 5 x 50 Front and Rear Facia Left Right 4T 2 x 5 x 45 Front and Rear Facia Center 4U 3 Trim Detail Plates 5 high Front Metal Drip Caps 4V 3 6 x 60 angled Front Metal Drip Caps Windows 4W 2 Window Inserts 18 1 4 w x 23 h ...

Page 6: ...t Wood Clamp Utility Knife 12X4 GardenSaver Shed with Sliding Double Doors and Metal Roof HARDWARE PACKAGE Y35 Roller Assembly x 4 Safety Glasses Work Gloves Safety Equipment Required Not Provided ST1 1 1 2 Torx Screws x 12 S5 4 Screws x 8 BT2 Torx Drive Bit x 1 Nut Driver x 20 1 4 x 2 long Metal Roof Screw 1 4 Nut Drivers Y38 Metal Roof Hanger x 5 Silicon Caulking 1 Y2 90 Metal Bracket Roof x 4 T...

Page 7: ...h off dirt from walls Brush off snow from roof regularly Routinely remove needles and leaves from roof Painting Staining Your cedar shed if left untreated will weather to a silvery grey colour Painting or staining your structure is highly recommended and will prolong the life of your shed You do not need to wait to paint or stain your shed the wood in your kit has been dried and can be stained or ...

Page 8: ... Frame and two 1B Floor Joists as illustrated above Position the center of each Joist 15 from the outer edge of Floor Frame When correctly positioned attach each Joist with 4 2 1 2 Screws 2 per end You can find the Square Drive Screw Bit in the Hardware Kit Bag Complete remaining Floor Frame the same Parts 1A Floor Joist Frames 45 1 2 x 70 3 4 x 2 1B Floor Joists 1 1 2 x 3 1 2 x 67 3 4 x 4 Hardwar...

Page 9: ...Caution Be careful when laying floor down not to bend or twist floor Note Having a level foundation is critical Choosing a foundation will vary between regions Typical foundations can be concrete pads or patio stones positioned underneath the floor runners 5 Position 1D Plywood Floor on top of completed floor frames Plywood will sit slightly inset from outside of floor frame Parts 1D Plywood Floor...

Page 10: ...ary to complete the Wall Section Identify all parts prior to starting Angled Wall Extenders 2pcs Part 2G Side Rear Wall Panels 5pcs Part 2AA Bottom Wall Plates 5pcs Part 2AB Front Wall Panels 2pcs Part 2BA Horizontal Wall Cleats 3pcs Parts 2J 2K Wall Extenders 3pcs Part 2H Top Triangular Siding Piece 2pcs Part 2F Front Wall Bottom Plates 2pcs Part 2BB Interior Door Header 1pc Part 2E Door Headers ...

Page 11: ...if panel is facing up or down Recently attached Bottom Plate is on bottom of panel Outside 2x3 framing of wall panel should be positioned flush with the outside of floor framing when properly aligned 9 The rear wall panels will sit even with the floor frame and the sidewall panels will be sandwiched between the front and rear wall panels The floor plywood may be slightly recessed Note Siding will ...

Page 12: ... joists Wall siding should overhang floor by approximately 3 4 When positioned correctly attach both side wall panel studs together as per Step 10 10 Position rear solid wall into place on plywood floor Butt both vertical wall studs of side and rear walls together and attach with 3 2 1 2 Screws Screw at the bottom middle and top of stud to secure properly Note Drill pilot holes in studs to prevent...

Page 13: ...l Place Front Walls so wall framing is flush with floor frame and siding overhangs Attach with 3 2 1 2 Screws per panel as per Steps 10 12 12 Complete remaining side wall attachment as per Steps 10 11 Front of Shed Parts 2BA Front Wall Panels 35 wide x 73 high x 2 2BB Bottom Wall Plates 1 5 8 x 2 1 2 x 35 x 2 Hardware S1 2 1 2 Screws x 12 total Ensure bottom plate is flush side to side with wall s...

Page 14: ... top Align flush outside with wall siding 15 Attach 2C Door Header Short to other side Position and attach 2D Door Header Long between short door headers The Long Door Header has an aluminum strip attached to the back for added support Attach by screwing down into wall framing with 2 3 Screws per side Fasten aluminum strip to short headers with 2 1 1 4 Screws per side Aluminum strip on back of Lon...

Page 15: ...extender will overhang and cover siding of side wall Parts 2G Angle Wall Extenders L R 2G 45 1 2 wide x 2 2F Top Triangular Siding Piece 2F Left Right x 2 Hardware N1 1 1 2 Finishing Nails x 6 total 17 Align wall framing of Angled Wall Extender and Side Wall so they are flush at the front The siding for both walls should also align evenly from front to back Wall framings flush Siding lines up Sidi...

Page 16: ...ender Walls 2H 45 1 2 wide x 3 Hardware S1 2 1 2 Screws x 12 total 19 Complete opposite Angled Wall Extender positioning and attachment as per Step 18 Cleat protects overhanging siding on upper walls from damage Please remove before installing Overhanging siding Protective cleat Siding overhang rests in notch framing aligned in front Framing flush along top Pilot Hole first Toll Free 1 888 658 165...

Page 17: ...th 3 1 1 4 Screws per short cleat and 6 1 1 4 Screws on the long cleat Parts 2J Horizontal Wall Cleat Long 3 4 x 3 1 2 x 84 x 1 2K Horizontal Wall Cleats Short 3 4 x 3 1 2 x 26 1 4 x 2 Hardware S2 1 1 4 Screws x 12 total Flush with top of wall frame Parts 2I Extender Wall Cleats 1 1 2 x 2 1 2 x 42 3 8 x 3 Hardware S1 2 1 2 Screws x 9 total Toll Free 1 888 658 1658 www outdoorlivingtoday com sales ...

Page 18: ...if measurements are not within 1 4 your walls are not square 23 Attach 2E Interior Door Header as shown above Align with top framing of front walls Attach with 4 2 1 2 Screws Hardware S1 2 1 2 Screws x 4 total Parts 2E Interior Door Header 1 1 2 x 3 x 66 1 2 x 1 66 1 2 Advice Use Interior Door Header to confirm doorway opening is 66 1 2 wide at top and bottom Toll Free 1 888 658 1658 www outdoorli...

Page 19: ...Wall siding should overhang floor while 2x3 wall plates should sit flush with floor Hardware S1 2 1 2 Screws x 28 total Bottom Wall Optional Caulking seams will help prevent moisture from entering at seam Caulking not included in kit Metal Roof Panels 5pcs Part 3K Rafters 9pcs Part 3A Facia Nailing Strips 2pcs Part 3F Soffits L R 4pcs Part 3B Soffit Center 2pcs Part 3C Roof Battens Parts 3G 3H Foa...

Page 20: ...3 4 20 1 2 21 3 4 21 3 4 Rear Front 141 1 2 Parts 3A Rafters 1 1 2 x 2 1 2 x 54 x 9 3B Front Rear Soffits L R 1 2 x 3 1 2 x 48 x 4 3C Front Rear Soffit Center 1 2 x 3 1 2 x 45 1 2 x 2 Hardware S1 2 1 2 Screws x 24 total S2 1 1 4 Screws x 18 total A B Rear Soffit C Screw double rafters together with 3 2 1 2 Screws Screw Rear Soffits to Rafters with 2 1 1 4 Screws per rafter end Note We recommend yo...

Page 21: ...an vary slightly 40 1 2 40 1 2 Check inside to inside measurements of wall studs This should be consistent along the length of the shed approximately 40 1 2 26 Carefully flip completed Rafter Section over so Front Soffit is facing the front and place on GardenSaver walls Note Double check that your Rafter Section is positioned correctly by ensuring the ends of the Rafters are sloped vertically as ...

Page 22: ... With outside rafters properly secured attach remaining interior rafters using 1 2 1 2 Screw per rafter end at the front of the shed Screw into rafters from inside of Header on an angle Hardware S1 2 1 2 Screws x 7 total 31 With outside rafters properly secured attach remaining interior rafters using 1 2 1 2 Screw per rafter end at the rear of the shed Screw into rafters from inside of Extender Wa...

Page 23: ... 3 4 x 3 1 2 x 50 x 6 3H Roof Battens Center 3 4 x 3 1 2 x 45 1 2 x 3 33 Locate Batten Spacers Place one Batten Spacer above each Batten lengthwise along outside Rafter Attach each Batten Spacer to outside Rafter with 2 1 1 4 screws per Batten Spacer 4 total Hardware Steps 32 36 S2 1 1 4 Screws x 34 total D ouble R after 1 8 back from Rafter end Overhanging 2 on outside Rafter Parts Steps 32 36 3D...

Page 24: ...n and attach 2 remaining Batten Spacers as per Step 33 with 2 1 1 4 screws per spacer 4 total 36 Position and attach 3rd row of Battens as per Step 32 Position Battens flush to Batten Spacers from Step 35 Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 24 ...

Page 25: ...efore they are fastened Parts 3K Metal Roof Panels 39 x 58 1 2 x 5 Hardware Y38 Metal Roof Hangers x 5 total 38 Locate all Metal Roof Hangers and Metal Roof Panels Identical To temporarily help hold the Metal Roof Panel in place hook a Metal Roof Hanger onto the lower Batten approximately where the center of the first Panel will be Place the first Metal Roof Panel on Battens Do not fasten Panels d...

Page 26: ... the end of Battens can vary from 1 3 depending on your personal preference 39 Overhang the Metal Roof Panels past the Battens on the sides by approximately 3 4 The overhang on front and back will be set by the Metal Roof Hangers but should be approximately 1 on the front and approximately 4 on the back 3 4 Overhang Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com P...

Page 27: ...ten row Only fasten screws half way so the Metal Roof Hangers can be removed Metal screw is self tapping screw into the center of Battens Ten more 2 Metal Screws will be required to further secure Metal Roof Panels and to complete Metal Drip Caps in later steps Hardware 2 Metal Roof Screws x 6 total Loosely attach middle row before removing Metal Roof Hangers Screw into center of Battens Screw int...

Page 28: ...partially attached in Step 42 Do not overtighten Hardware 2 Metal Roof Screws x 6 total Tighten middle row be careful not to overtighten 43 Before fully fastening Metal Roof Panels down remove the Metal Roof Hangers and insert Foam Enclosures between Metal Roof Panels and Battens at the rear bottom Enclosures will prevent moisture and unwanted bugs etc from entering your shed from here Parts Foam ...

Page 29: ...ia Center Part 4T Interior Door Flange Part 4J Front Corner Filler Trim Part 4C Rear Corner Filler Trim Part 4D Lower Door Track Cover Parts 4HA Lower Door Track Part 4G Sliding Doors Part 4F Window Inserts Part 4W Window Trim Part 4X Aluminum Door Tracks Part 4E Sliding Door Track Stops Parts 4IA Track Overlay System Parts 4KA 4KB 4KC 4KD Rear Middle Trim Part 4P Front Middle Trim Part 4Q Trim De...

Page 30: ... Hardware N1 1 1 2 Finishing Nails x 12 total Skirting meets flush 45 Attach 4A Side Rear Bottom Skirting around the base of the shed Skirting will hide floor framing Start with side skirting pieces first and attach with 4 1 1 2 Finishing Nails per piece Parts Steps 45 46 4A Side Rear Bottom Skirting Bevel 3 4 x 4 1 2 x 45 1 4 x 5 Hardware Steps 45 46 N1 1 1 2 Finishing Nails x 20 total Toll Free ...

Page 31: ...hey serve as nailing strips for the Corner Trims which will be attached later Parts 4C Front Corner Filler Trim 1 2 x 2 1 2 x 42 x 4 Hardware N1 1 1 2 Finishing Nails x 16 total Gap will be covered 48 Trim out Rear Walls by attaching Top Wall Trim Position with thick end of Bevel downward at top wall tight against Soffits Attach with 4 1 1 2 Finishing Nails per piece Parts 4BB Top Wall Trims 3 4 x...

Page 32: ...r Track Position second Track the same and attach with 3 1 1 2 Torx Screws per bracket Complete remaining Torx Screws on brackets of first Track Hardware ST1 1 1 2 Torx Screws x 12 total 33 1 4 Attach 1 Torx Screw per bracket to hold in place while aligning other track Parts 4E Aluminum Door Tracks x 2 Bottom of bracket flush with bottom of Interior Door Header Toll Free 1 888 658 1658 www outdoor...

Page 33: ...rs meet in the middle Left Side Door Parts 4F Sliding Doors 36 x 73 x 2 Right Side Door Twist Roller Cart onto bolt After doors are hung you may need to adjust this until doors hang straight up and down at equal height Wider door trim towards center Hardware S2 1 1 4 Screws x 16 total Y35 Roller Assembly x 4 total Note If there is a gap between your doors at the top or bottom remove the door and t...

Page 34: ...uld be flush with each other Secure Door Tracks to shed with 6 3 screws per piece Secure Door Stops with 2 3 screws per piece Parts 4G Lower Door Track 1 1 2 x 1 1 2 x 61 1 8 x 2 4IA Door Track Stops 1 1 2 x 2 x 3 1 2 x 3 Hardware S4 3 Screws x 18 total Bottom Door Cleat Lower Door Track 1 4 Gap Centered on Floor Runner Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday c...

Page 35: ... so doors can not slide out of the track Secure each piece of Track Cover with 4 2 1 2 screws Parts 4HA Lower Door Track Cover 3 4 x 3 x 44 1 4 x 3 Hardware S1 2 1 2 Screws x 12 total Door Stop and Track Cover are flush Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 35 ...

Page 36: ...e door frame and attach with 5 1 1 4 Screws Parts 4J Interior Door Flange 3 4 x 3 1 2 x 71 1 2 x 1 Hardware S2 1 1 4 Screws x 5 total Left Side Door Left Side Door Right Side Door Door Flange attaches to Left Side Door Flush with inside of door frame Left Side Door Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 36 ...

Page 37: ...ws x 6 total N1 1 1 2 Finishing Nails x 24 total 57 Position both of 4KB Track Overlay Front onto the edge of the Overlay Top so they meet at the center Ends of the Overlay Front will protrude 1 2 past the ends of the Overlay Top Attach with 8 1 1 2 Finishing Nails per piece Next attach 4KC Track Overlay Ends as shown above with 4 1 1 2 Finishing Nails per piece Centered above Aluminum Tracks Bott...

Page 38: ...x 88 3 4 x 2 4M Side Front Corner Trims 1 2 x 2 1 2 x 88 3 4 x 2 Hardware N1 1 1 2 Finishing Nails x 32 total 5 1 2 tight underneath soffit 58 Position 4KD Track Overlay Sill pieces evenly on top of Track Overlay with the slope facing away from the shed This will prevent rainwater from collecting on top Attach with 3 1 1 2 Finishing Nails per piece Hammer carefully and support the Track Overlay fr...

Page 39: ... 1 2 x 78 1 2 x 2 Hardware N1 1 1 2 Finishing Nails x 16 total 60 To complete trimming out rear corners locate 4N 4O Rear Corner Trims Align and attach as per Step 59 Parts 4N Rear Corner Trims 1 2 x 5 1 2 x 78 1 2 x 2 4O Side Rear Corner Trims 1 2 x 2 1 2 x 80 x 2 Hardware N1 1 1 2 Finishing Nails x 32 total Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 39 ...

Page 40: ...le Cut Ends 1 2 x 5 1 2 x 54 1 8 x 2 4S Front Rear Facia L R 1 2 x 5 1 2 x 50 1 2 x 4 4T Front Rear Facia Center 1 2 x 5 1 2 x 45 1 2 x 2 Hardware Steps 63 66 N1 1 1 2 Finishing Nails x 46 total 62 Attach 4Q Front Middle Trims above doors where front wall extenders come together above track Attach with 3 1 1 2 Finishing Nails per piece aligning tight underneath soffit and centered on seam Parts 4Q...

Page 41: ...r Steps 63 Small gaps may occur between the Center and Left Right Facia these will be covered by Facia Detail Plates in Step 67 Rear Facia will cap the side Facia Attach Rear Facia to rafter ends with 2 1 1 2 Finishing Nails per rafter end Small gaps may occur Side Facia Rear Facia Rear Facia caps Side Facia Small gaps may occur 64 Attach other Front and Side Facia to opposite corner as per Step 6...

Page 42: ...p of Metal Roof Place Front Metal Drip Caps 3 pieces 60 long on top of metal roof at front Evenly space from side to side allowing caps to overlap each other Overhang the cap approxi mately 1 past each end When Drip Cap is correctly positioned secure with 5 2 long self tapping Metal Roof Screws as per Step 44 Screw into to top batten Do not overtighten Parts 4V Front Metal Drip Caps 6 x 60 angled ...

Page 43: ...arge amount Trim dado sits in flange 70 Position 4X Window Trim around window doing a dry run first and attach with 4 1 1 2 Finishing Nails per piece Window trim has a small dado on reverse face Outside flange of window will roughly sit in the dado to give a better fit Complete both windows the same Parts 4X Window Trim Kit x 2 Top pc 24 1 16 x 1 Angle Ends Side Bottom pcs 23 x 3 Hardware N1 1 1 2...

Page 44: ...omer Service 2 On Time Shipping 3 Motor Freight Delivery 4 Quality of Materials 5 Assembly Manual 6 Overall Satisfaction Toll Line 1 888 658 1658 Fax 1 604 462 5333 sales outdoorlivingtoday com The materials contained in this Assembly Manual may be downloaded or copied provided that ALL copies retain the copyright and any other proprietary notices contained on the materials No material may be modi...

Reviews: