69.
Position first
Roof Ridge Board
(1/2” x 4 1/2” x 51 5/8”)
at the front of roof to cap off shingles
and facia. Ridge Boards should meet on seam of roof panels. When aligned correctly, attach with
4 - 1 1/2” nails per piece.
70.
Attach
Facia / Detail Plates
to cover seams where Front and Rear Facia pieces come
together. Secure with 4 - 1 1/2” finishing nails per piece.
71.
Attach
Upper
Interior
Door Trim (2)
(1/2” x 1/2” x 28 7/8”) positioning 1st trim against
door jamb and underneath door header flush to
edges on inside as shown to the right. Attach with
4 - 1 1/2” finishing nails.
Flush with
header and jamb.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 31