38.
Attach end of a 45 1/2” long Soffit Board flush to ends of outside
rafter with 2 - 1 1/4” screws per rafter end.
Drill pilot hole in Soffit
ends to prevent splitting.
Attach Ridge Board to opposite rafter end
aligning to bottom of rafter with 2 - 1 1/4” screws. Center Soffit on
Middle Rafter and secure with 2- 1 1/4” screws. Measure 45 1/2”from
outside rafter and secure Ridge Board to rafter with 2 - 1 1/4” screws.
Attach Middle Rafters together with 3 - 2 1/2” screws.
Ridge Board
Important -
Ridge
Board must be
aligned to bottom
of rafter end.
37.
Locate 6 - 1 1/2” x 3 1/2” x 56 1/2”
long
Rafters,
2 - 1/2” x 4 1/2” x 45 1/2”l
Soffits
and completed Ridge Board from
Step 36.
Lay out as illustrated to the left
on a flat level surface.
Ridge Board
4 1/2” wide
Soffits
56 1/2”l Rafters
20 1/2”
23 1/2”
20 1/2”
91”
Centered on
Rafter
45 1/2”
Att
ach Middle
Raf
ters with 2 1/2”
Sof
fit
45 1/2”
39.
Measure, position and attach interior Rafters as illustrated above.
Complete 2nd Rafter Section as per
Step 37-38. Important -
Make sure to Offset Metal
Ridge Board Connectors. See
Step 44.
Interior Rafter
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 15