Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 33
73.
Locate
Part JJ - Detail Caps - 1/2” x 3 1/2” x 10”.
Position to
cover Post and Rafter connection. Attach with 4 - 2” finishing nails per
piece. In the Front and Rear, attach Cap to cover Rafter/Ridge Board
connection. Attach with 4 - 1 1/2” finishing nails.
74.
Locate
Parts MM and NN - Potting Shelves - 16” x 43 3/4” and Potting Shelf Supports -
1 1/2” x 2 1/2” x 20 1/2”.
With helper holding Shelf just under the Top Wall Cap, screw to wall from
underneath with 3 - 3” screws as shown above.
75.
Position two Potting Shelf Supports against Post and under Shelf framing. Level Shelf and
attach each Support with 2 - 3” screws. Add and attach second Shelving and Supports for side.