44.

 Adjust the position of remaining 

Metal Roof Panels

 on 

Battens

 as per 

Step 43

. Overlap 

Metal 

Roof Panels

 to achieve the desired overall width. Overall width past the end of

 Battens

 can vary 

from 1” - 3”, depending on your personal preference.

Metal roof Panels 
should overlap 
each other.

43.

 Overhang the 

Metal Roof Panels

 past the

 Battens

 on the sides by approximately 3/4”. 

The overhang on front and back will be set by the 

Metal Roof Hangers

, but should be 

approximately 4” on the back and approximately 1” on the front. 

3/4” Overhang

  Toll Free 1-888-658-1658              www.outdoorlivingtoday.com        [email protected]

Page 23

Summary of Contents for 8x4 GardenSaver

Page 1: ...t be provided free of charge after the 30 day grace period All structures purchased from Outdoor Living Today are covered for a period of one year for defects in manufacturing and workmanship Costs incurred for customer installations are not included Failure to use supplied parts included in this kit could result in poor product performance and may void your warranty Please contact Outdoor Living ...

Page 2: ...ide on the type of foundation you will be using Concrete slab or 4 6 inches of crushed gravel with paver stones or 4x4 stringers You can find the footprint for your shed on Page 3 of your Assembly Manual If doing the assembly yourself have all the necessary tools ready to go and in working condition A list of required tools can be found after the parts list One helper is recommended to assist in co...

Page 3: ...nd of floor frame Saves money on materials easy to level and work with Gravel with Patio Paver Stones Excavate at least 6 deep and 6 wider than floor frame on each side 1 0 Cubic Yards of gravel required approximately 9 wheelbarrows 15 patio pavers 8 x 8 or larger Center patio paver stones underneath floor runners and underneath seams in floor joists Patio paver stones are widely available from mo...

Page 4: ...iscellaneous Section Skirting Trim Door Facia Misc Parts 4 x 4 x 45 Bottom Skirting Bevel Siding 2 3 4 x 4 x 45 1 4 Front Bottom Skirting non Bevel Steps 49 51 6 7 8 x 2 x 36 Corner Filler Trims 2 3 4 x 2 x 36 Corner Filler Trims Front Left Step 18 2 3 4 x 2 x 10 Front Top Corner Filler Trims Steps 18 29 52 2 x 5 x 79 Rear Corner Trims 2 x 5 x 88 Front Corner Trims 2 x 2 x 80 Side Rear Corner Trim...

Page 5: ...liers Tools Required Not Provided 1 8 1 2 Drill Bits Utility Knife 1 1 2 Finishing Nail 245 Pcs Black Hasp x 1 Roller Assembly x 2 Torx Drive Bit x 14 1 4 x 2 long Metal Roof Screw Metal Roof Hanger x 3 x 1 1 4 Nut Driver Y2 90 Metal Bracket Roof x 4 Silicon Caulking 1 2 1 2 1 1 4 3 4 175 Pcs 140 Pcs 12 Pcs Black Headed 6 Pcs 1 1 2 4 8 Pcs Torx Screws 3 15 Pcs Toll Free 1 888 658 1658 www outdoorl...

Page 6: ... Wall Panel Small gap between bevel siding and window trim Dab of caulking Strip of roofing paper over apex of roof panels Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 6 Routine Maintenance Routinely check all fasteners are tight ex Door Hinges Nails Brush off dirt from walls Brush off snow from roof regularly Routinely remove needles and leaves from roof P...

Page 7: ...7 8 as illustrated above Position Joists equally in Floor Joist Frame Use Small Floor Joist Frame as a template to determine joist position Position Joist so flush with framing Flush with framing Front of GardenSaver Door Location Small Floor Joist Frame You can find the Square Drive Bit for the screws in the Hardware Kit Bag 2 When correctly positioned attach each Joist with 4 2 1 2 Screws 2 per ...

Page 8: ...wn not to bend or twist floor Note Having a level foundation is critical Choosing a foundation will vary between regions Typical foundations can be concrete pads or patio stones positioned underneath the floor runners 6 When in place level floor completely before proceeding 7 Position Plywood Floor pieces 2 on top of completed floor joists Flush with Floor Framing Front 4 Position and attach Floor...

Page 9: ...are flush with framing Door Header Short Important Pilot hole ALL 2x3 Wall Studs with 1 8 drill bit prior to screwing This will make it much easier to attached together Pilot Hole first Extendor Wall Cleats 2 Extendor Top Siding piece 2 7 8 thick Filler Trim 3 4 thick Filler Trim 8 Position Plywood so it sits almost flush with outside of floor joist framing see Note When correctly positioned attac...

Page 10: ...tioned correctly locate 2nd Solid Wall Panel and place in corner Wall Plate Flush with floor frame Do not align wall siding to floor Align wall plate to outside of floor frame 12 Butt both vertical wall studs of side and rear walls together and attach with 3 2 1 2 Screws Screw at the bottom middle and top of stud to secure properly Have helper push wall framing together while securing to ensure ti...

Page 11: ...y attach both wall panel studs together as per Step 12 with 3 2 1 2 Screws 14 With Rear Wall Panel in place position other side wall panel on floor as per Step 10 11 Rear Wall Panel 15 Secure side wall panel to rear wall panel as per Step 12 Next locate the Front Wall Panel 73 high and position in front right corner Pilot Hole first Pilot Hole first Toll Free 1 888 658 1658 www outdoorlivingtoday ...

Page 12: ...ttach short header using 2 2 1 2 Screws as shown above 18 Locate Front Left Corner Filler Trims 2 3 4 x 2 1 2 x 36 and Door Jamb 1 1 2 x 3 1 2 x 73 Attach both Fillers with 4 1 1 2 Finishing Nails as shown above Place Door Jamb against inside wall stud and align with edge of filler Attach Jamb with 4 2 1 2 Screws 17 When correctly positioned secure Front Wall Stud to Side Wall Stud with 3 2 1 2 Sc...

Page 13: ... wall extendor and align as shown above Attach with 3 1 1 2 Finishing Nails to top wall framing There are left right top siding pieces Use rough surface side out Place finished wall extendor on side wall panel frame Complete both sides now Note Bottom siding of wall extendor will overhang and cover siding of side wall Wall framings flush Siding lines up 5 1 2 5 1 2 Top Siding Pc Sidings will overl...

Page 14: ... extendor framing flush with inside edge of Header Overhanging siding on front of extendor will rest in notch of Header 1 4 recess 25 Attach Wall Extendor to both the Angled Wall Extendor framing and the Door Header with 5 2 1 2 Screws Pilot Hole first Flush Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 14 ...

Page 15: ...Rear Wall framing To help strengthen the Rear Walls there is a short and a long wall cleat which meet off center from the seam between walls Attach Cleats with 8 1 1 4 Screws 27 With Extendor Walls attached position Extendor Wall Cleats 2 1 1 2 x 2 1 2 x 42 3 8 in the lower section of each Extendor Wall Attach with 3 2 1 2 Screws per cleat Toll Free 1 888 658 1658 www outdoorlivingtoday com sales ...

Page 16: ... now will make it easier to install roof section 99 1 4 29 Position and attach Front Right Corner Filler Trims 2 7 8 x 2 1 2 x 36 with 4 1 1 2 Finishing Nails per piece Attach Front Top Corner Filler Trim 2 3 4 x 2 1 2 x 10 to both sides as shown above Use 2 1 1 2 Finishing Nails per piece Filler trims won t be visible because they serve as nailing strips for the Corner Trims which will be attache...

Page 17: ...ening is 44 wide Prior to securing make sure wall panels are aligned correctly on the floor Refer to Step 11 Wall siding should overhang floor while 2x3 wall plates should sit flush with floor Bottom Wall Optional Caulking seams will help prevent moisture from entering at seam Caulking not included in kit Pilot Hole first 44 Wide Door Opening top bot Roof Battens 6 Foam Enclosures Multiple Pieces ...

Page 18: ...ove Measure and attach remaining Soffit Rafter connections using 2 1 1 4 screws per rafter soffit Front Soffit Boards 2 Rear Soffit Boards 2 48 21 3 4 21 3 4 96 A B C Rear Soffit Mid Rafter Mid Rafter Rear Front Soffits Screw center rafters together with 3 2 1 2 screws Note We recommend you drill a 1 8 pilot hole for each screw to avoid splitting wood The hole depth should be equal to 3 4 the leng...

Page 19: ...t and Rear Soffits will sit approximately 1 8 away from wall siding This can vary slightly 32 Carefully flip completed Rafter Section over so Front Soffit is facing the front and place on GardenSaver walls Note Double check that your Rafter Section is positioned correctly by ensuring the ends of the Rafters are sloped vertically as shown above Rafter ends vertical Side View Toll Free 1 888 658 165...

Page 20: ...all framing at front of shed and inside Rear Wall framing at rear of shed behind Horizontal Wall Cleats Front 37 Position first row of Roof Battens 3 4 thick x 3 1 2 wide x 50 long x 2 on front of roof rafters Place flush with rafter end Batten will sit evenly on center rafters overhanging 2 on the outside rafters Attach batten with 1 1 1 4 screw per each rafter Pre drill with 1 8 drill bit first ...

Page 21: ...ched Batten Spacers via the same method as Step 37 Attach a second row of Batten Spacers flush with the bottom edge of this middle Batten row via the same method as Step 38 40 Locate lower row of Roof Battens 2 pcs x 3 4 thick x 3 1 2 wide x 50 long and attach flush with previously attached Batten Spacers via the same method as Step 37 using a total of 6 1 1 4 screws Important Pre drill pilot hole...

Page 22: ...de x 58 1 2 long Identical To temporarily help hold the Metal Roof Panel in place hook a Metal Roof Hanger onto the lower Batten approximately where the center of the first Panel will be Place the first Metal Roof Panel on Battens Do not fasten Panels down until Steps 46 48 Place other two Metal Roof Panels with Hangers the same way Metal Roof Hangers will temporarily help keep Metal Roof Panels i...

Page 23: ...ing on your personal preference Metal roof Panels should overlap each other 43 Overhang the Metal Roof Panels past the Battens on the sides by approximately 3 4 The overhang on front and back will be set by the Metal Roof Hangers but should be approximately 4 on the back and approximately 1 on the front 3 4 Overhang Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com P...

Page 24: ...etal Ridge Caps in later steps Note Metal Roof Hangers will need to be removed in Step 47 45 Once Metal Roof is spaced correctly from side toside and top to bottom lift panels up and run a bead of caulking down the overlapping seams of each panel to seal the joints You will likely need assistance from a helper in this step Bead of Caulking Loosely attach middle row before removing Metal Roof Hange...

Page 25: ...nishing Nails per piece Secure lower front Batten row be careful not to overtighten 47 Before fully fastening Metal Roof Panels down remove the Metal Roof Hangers and insert Foam Enclosures between Metal Roof Panels and Battens at the rear bottom Enclosures will prevent moisture and unwanted bugs etc from entering your shed from here Remove Metal Roof Hangers Insert Foam Enclosures Tighten middle ...

Page 26: ...he base of the shed Skirting will hide floor framing Start with side skirting pieces first and attach with 4 1 1 2 Finishing Nails per piece Rear Corner Trim 2 Front Bottom Skirting 2 Lower Door Track Cover Track Overlay Front Sliding Door Window Insert Window Trim Aluminum Door Tracks Lower Door Track Guide Track Overlay Top Side Angle Cut Facia 2 Side Rear Corner Trim 2 Track Overlay Sill 2 Side...

Page 27: ...ttached later There will be two 36 long fillers per corner Position with a slight gap in the middle and attach with 4 1 1 2 Finishing Nails per piece Skirting meets flush in center Skirting meets flush in center 51 Attach Front Skirting 2 3 4 x 4 x 45 1 4 with 4 1 1 4 Screws per piece Front Skirting does not have a bevel cut Align as per side and rear skirting Gap Toll Free 1 888 658 1658 www outd...

Page 28: ...he same 5 1 2 Side Skirting 55 To completely trim out rear corners locate Side Rear Corner Trims 1 2 x 2 1 2 x 80 and Rear Corner Trims 1 2 x 5 1 2 x 79 Align and attach as per Step 54 53 To Trim out front corners locate a Side Front Corner Trim 1 2 x 2 1 2 x 88 3 4 and a Front Corner Trim 1 2 x 5 1 2 x 88 3 4 Side Front Corner Trim 2 1 2 wide Front Corner Trim 5 1 2 wide Front Skirting tight unde...

Page 29: ...h with 8 1 1 2 Finishing Nails aligning tight underneath soffit and center on seam 57 Locate Aluminum Door Track and position above doorway evenly spaced between wide front corner trim Ensure Track is level Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 29 ...

Page 30: ...crew per bracket to hold in place Attach 2nd bracket with another 1 1 2 Torx Screw Check level once again Complete attachment of remaining Torx Screws on brackets of Track 59 Locate Sliding Door and flip over onto a clean dry and level spot Position Door Stop 1 1 2 x 2 1 2 x 66 7 8 on left inside frame of door as shown above Position 1 from outside trim of door as shown above Attach with 3 2 1 2 S...

Page 31: ...12 1 2 12 1 2 60 Locate Roller Assemblies Before attaching to top of doors assemble the units as shown above Attach two Roller Assemblies onto door with 4 1 1 4 Screws per Assembly center on the door framing 12 1 2 from each end as shown above Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 31 ...

Page 32: ...er Door Tracks and Door Stops Center Door Track side to side and resting on Long Floor Runners Bottom of Door Stops and Door Tracks should be flush with each other Secure Door Tracks to shed with 9 3 screws Secure Door Stops with 2 3 screws per piece Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 32 ...

Page 33: ...sill attachments IMPORTANT Slide door back and forth to confirm door slides freely prior to attaching Top Track Overlay Track Brackets are slotted so door position can be adjusted horizontally as well as vertical position with Roller Assemblies 63 Locate Door Track Cover Line up so Track Cover is flush with ouside edges of Door Stops This creates an enclosure so the door can not slide out of the t...

Page 34: ...Track Check level before securing with 6 4 Screws Edge of overlay has been pre drilled for screws 66 Locate Top Track Overlay Front 3 4 x 5 1 2 x 87 3 4 Position front overlay underneath sill Attach with 12 1 1 2 Finishing Nails Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 34 ...

Page 35: ...l against Rafter Facia Nailing Strip Align so Front Facia caps Side Facia and then attach the front with 6 1 1 2 Finishing Nails Attach side with 5 1 1 2 Finishing Nails securing them into the nailing strip closer to the top of the side facia board Attach next piece of Front Facia Note With Front Facia correctly aligned at corners a small gap may occur at center seam This will be covered by Front ...

Page 36: ...t Metal Ridge Caps 2 pieces 60 long on top of metal roof in the front Insert Foam Enclosures underneath Ridge Caps Evenly space from side to side allowing caps to overlap each other Overhang the cap approximately 1 past each end When ridge cap is correctly positioned secure with 4 2 self tapping metal screws as per Step 48 Screw into to top batten Do not overtighten Foam Enclosures Toll Free 1 888...

Page 37: ...1 1 4 Screws Caulk gap between siding and window at top This requires a large amount of caulking but is important to fill Later Window Trims will be installed to hide caulking 74 Position Window Trim around window doing a dry run first and attach with 4 1 1 2 Finishing Nails per piece Window trim has a small dado on reverse face Outside flange of window will roughly sit in the dado to give a bette...

Page 38: ...ping 3 Motor Freight Delivery 4 Quality of Materials 5 Assembly Manual 6 Overall Satisfaction The materials contained in this Assembly Manual may be downloaded or copied provided that ALL copies retain the copyright and any other proprietary notices contained on the materials No material may be modified edited or taken out of context such that its use creates a false or misleading statement or imp...

Reviews: