Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 9
7.
Attach
Front Floor Runners
to completed floor frame with notch aligned
flush with corner of floor framing and edge overhanging front by 2”.
The overhanging edge of the front floor runners will be used later to support
the sliding door track. Attach with
6 - 2 1/2” Screws
per Runner.
Parts
Front Floor Runners
(1 1/2” x 5 1/2” x 68 3/16”)
x 2
Hardware
S1
- 2 1/2” Screws
x 12 total
9.
With Floor Runners attached, carefully flip the floor over and place on your foundation.
Caution:
you will need 2 people to assist you. Be careful when laying floor down not to bend or twist floor.
When in place, level floor completely.
Note:
The floor will be flipped over
and the floor runners will sit on your
foundation. It is important to note that
having a level foundation is critical
.
Choosing a foundation will vary
between regions.
See page 3 of this assembly manual
for more information on foundations.
Foundations
8.
Attach
Floor Runners
to completed floor frame as shown
above. Make sure Runners are flush with side and rear of
floor framing but not overhanging. Use
6 - 2 1/2” Screws
per
Runner.
Parts
Floor Runners
(1 1/2” x 3 1/2” x 68 3/16”)
x 8
Hardware
S1
- 2 1/2” Screws
x 48 total
Concrete Slab
Foundation