Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 18
39.
Locate Vertical Side Wall Trims. Position over
seams in side walls on both sides of shed. Attach
each piece with
6 - 1 1/2” Finishing Nails
.
Hardware
N1
- 1 1/2”
Finishing Nails
x 36 total
Parts
12C - Vertical Side Wall
Trims
(1/4” x 2” x 82 1/4”)
x 6
40.
Attach Rafter Bottom Trims to cover under-
side of Rafters with Cedar Trim. Position under
the Rafter and fasten with
5 - 1 1/2” Finishing Nails
per piece.
Hardware
N1
- 1 1/2”
Finishing Nails
x 36 total
Parts
13C,14C - Rafter
Bottom Trims
(1/2” x 1 1/2” x 41 1/4”)
x 4
(1/2” x 3” x 41 1/4”)
x 3
38.
Locate Horizontal Side Wall Trims. Position trims
up against wall siding and below ceiling plywood and
Rafters. Evenly space trims on side walls and attach
each piece with
4 - 1 1/2” Finishing Nails
.
Hardware
N1
- 1 1/2”
Finishing Nails
x 24 total
Parts
7C - Horizontal Side
Wall Trims
(1/4” x 2” x 58”)
x 6